IAC logo
IAC Assessment: OD0097
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OD0097
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Old Dominion Univ.
Assessment Year 1997
Principal Product Filters
NAICS n/a
SIC 3564 - Blowers And Fans
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 193,300
Annual Production 72,000 Pieces
Production Hrs. Annual 8,760
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $347,501 7,769,051 kWh $0.04
Electricity Demand $199,314 16,159 kW-months/year $12.33
Electricity Fees $19,072 - $ -
Natural Gas $119,904 21,775 MMBtu $5.51
TOTAL ENERGY COSTS $736,487
RECOMMENDED SAVINGS* $27,669 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (haz)
$ kWh $ kW-months/year $ MMBtu $ gal
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,814
Cost:
$7,298
$4,219 94,373 $1,595 129 - - - - $4,219
94,373
kWh
$1,595
129
kW-months/year
-
-
MMBtu
-
-
gal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,074
Cost:
$21,501
$7,863 175,850 $6,211 504 - - - - $7,863
175,850
kWh
$6,211
504
kW-months/year
-
-
MMBtu
-
-
gal
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,885
Cost:
$829
$2,885 64,478 - - - - - - $2,885
64,478
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,355
Cost:
$693
- - - - $1,355 247 - - -
-
kWh
-
-
kW-months/year
$1,355
247
MMBtu
-
-
gal
05: 2.7314 REDUCE VENTILATION AIR Savings:
$3,070
Cost:
$1,630
$1,750 38,980 $1,320 107 - - - - $1,750
38,980
kWh
$1,320
107
kW-months/year
-
-
MMBtu
-
-
gal
06: 3.5112 REPROCESS SPENT OILS ON SITE FOR RE-USE Savings:
$471
Cost:
-
- - - - - - $471 550 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$471
550
gal
TOTAL RECOMMENDED Savings:
$27,669
Cost:
$31,951
$16,717 373,681 $9,126 740 $1,355 247 $471 550 $16,717
373,681
kWh
$9,126
740
kW-months/year
$1,355
247
MMBtu
$471
550
gal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (haz)