IAC Assessment: OD0106
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OD0106
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Old Dominion Univ.
Assessment Year 1998
Principal Product Topsoil and Decorative Mulch
NAICS n/a
SIC 2499 - Wood Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 63
Plant Area (Sq.Ft.) 50,000
Annual Production 500,000 Units
Production Hrs. Annual 4,080
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $91,378 1,028,429 kWh $0.09
Electricity Demand $26,240 4,929 kW-months/year $5.32
Electricity Fees $12,009 - $ -
LPG $10,155 1,139 MMBtu $8.92
Other Gas $9,068 1,608 MMBtu $5.64
TOTAL ENERGY COSTS $148,850
RECOMMENDED SAVINGS* $153,063 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $143,634
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Primary Product Electricity Usage Electricity Demand Personnel Changes Primary Product
$ kWh $ kW-months/year $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,634
Cost:
$5,786
$2,821 54,220 $813 157 - - - - $2,821
54,220
kWh
$813
157
kW-months/year
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,629
Cost:
$1,813
$1,066 20,516 $563 106 - - - - $1,066
20,516
kWh
$563
106
kW-months/year
-
-
$
-
-
$
03: 4.5130 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$7,800
Cost:
$6,000
- - - - $7,800 - - - -
-
kWh
-
-
kW-months/year
$7,800
-
$
-
-
$
04: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$140,000
Cost:
$20,000
- - - - - - $140,000 - -
-
kWh
-
-
kW-months/year
-
-
$
$140,000
-
$
TOTAL RECOMMENDED Savings:
$153,063
Cost:
$33,599
$3,887 74,736 $1,376 263 $7,800 - $140,000 - $3,887
74,736
kWh
$1,376
263
kW-months/year
$7,800
-
$
$140,000
-
$
TOTAL IMPLEMENTED Savings:
$143,634
Cost:
$25,786
$2,821 54,220 $813 157 - - $140,000 - $2,821
54,220
kWh
$813
157
kW-months/year
-
-
$
$140,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Primary Product Electricity Usage Electricity Demand Personnel Changes Primary Product