IAC Assessment: OD0108
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OD0108
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Old Dominion Univ.
Assessment Year 1998
Principal Product Glass Figurines
NAICS n/a
SIC 3231 - Products Of Purchased Glass
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 61,000
Annual Production 700,000 Pieces
Production Hrs. Annual 2,808
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $62,982 1,103,165 kWh $0.06
Electricity Demand $24,521 5,185 kW-months/year $4.73
Electricity Fees $3,853 - $ -
Natural Gas $13,442 1,936 MMBtu $6.94
LPG $36,066 3,356 MMBtu $10.75
TOTAL ENERGY COSTS $154,011
RECOMMENDED SAVINGS* $76,874 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,177
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas LPG Solid Waste (non-haz) By-product Production Electricity Usage Electricity Demand Natural Gas LPG Solid Waste (non-haz) By-product Production
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,767
Cost:
$8,940
$3,404 59,496 $1,363 288 - - - - - - - - $3,404
59,496
kWh
$1,363
288
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
02: 2.1332 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS Savings:
$61,697
Cost:
-
- - - - $25,631 3,356 $36,066 3,356 - - - - -
-
kWh
-
-
kW-months/year
$25,631
3,356
MMBtu
$36,066
3,356
MMBtu
-
-
lb
-
-
$
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$218
Cost:
$78
- - - - $218 54 - - - - - - -
-
kWh
-
-
kW-months/year
$218
54
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$4,965
Cost:
$10,000
- - - - - - - - $4,965 60,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$4,965
60,000
lb
-
-
$
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$5,227
Cost:
$2,760
- - - - - - - - - - $5,227 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
$5,227
-
$
TOTAL RECOMMENDED Savings:
$76,874
Cost:
$21,778
$3,404 59,496 $1,363 288 $25,849 3,410 $36,066 3,356 $4,965 60,000 $5,227 - $3,404
59,496
kWh
$1,363
288
kW-months/year
$25,849
3,410
MMBtu
$36,066
3,356
MMBtu
$4,965
60,000
lb
$5,227
-
$
TOTAL IMPLEMENTED Savings:
$15,177
Cost:
$21,778
$3,404 59,496 $1,363 288 $218 54 - - $4,965 60,000 $5,227 - $3,404
59,496
kWh
$1,363
288
kW-months/year
$218
54
MMBtu
-
-
MMBtu
$4,965
60,000
lb
$5,227
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas LPG Solid Waste (non-haz) By-product Production Electricity Usage Electricity Demand Natural Gas LPG Solid Waste (non-haz) By-product Production