IAC logo
IAC Assessment: OD0119
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OD0119
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Old Dominion Univ.
Assessment Year 1998
Principal Product Wooden Cable Reels
NAICS n/a
SIC 2499 - Wood Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 47
Plant Area (Sq.Ft.) 40,000
Annual Production 0 Units
Production Hrs. Annual 2,015
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $23,903 305,686 kWh $0.08
Electricity Demand $5,758 1,572 kW-months/year $3.66
Electricity Fees $5,085 - $ -
Natural Gas $5,526 695 MMBtu $7.95
TOTAL ENERGY COSTS $40,272
RECOMMENDED SAVINGS* $7,417 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,417
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,088
Cost:
$6,156
$1,669 21,395 $419 115 $1,669
21,395
kWh
$419
115
kW-months/year
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,251
Cost:
$8,135
$1,794 22,860 $457 125 $1,794
22,860
kWh
$457
125
kW-months/year
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$281
Cost:
$490
$224 2,931 $57 16 $224
2,931
kWh
$57
16
kW-months/year
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$126
Cost:
$100
$126 1,758 - - $126
1,758
kWh
-
-
kW-months/year
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,153
Cost:
$400
$1,153 14,654 - - $1,153
14,654
kWh
-
-
kW-months/year
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$1,518
Cost:
$100
$1,518 19,343 - - $1,518
19,343
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$7,417
Cost:
$15,381
$6,484 82,941 $933 256 $6,484
82,941
kWh
$933
256
kW-months/year
TOTAL IMPLEMENTED Savings:
$7,417
Cost:
$15,381
$6,484 82,941 $933 256 $6,484
82,941
kWh
$933
256
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand