IAC logo
IAC Assessment: OD0125
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OD0125
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Old Dominion Univ.
Assessment Year 1998
Principal Product Foam Medical Products
NAICS n/a
SIC 3086 - Plastics Foam Products
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 76,800
Annual Production 0 Units
Production Hrs. Annual 2,080
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $34,979 651,817 kWh $0.05
Electricity Demand $14,020 2,745 kW-months/year $5.11
Electricity Fees $997 - $ -
Natural Gas $19,474 3,138 MMBtu $6.21
TOTAL ENERGY COSTS $70,899
RECOMMENDED SAVINGS* $26,731 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,256
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,283
Cost:
$67,670
$6,319 117,819 $2,964 580 - - $6,319
117,819
kWh
$2,964
580
kW-months/year
-
-
MMBtu
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$704
Cost:
$840
$704 22,274 - - - - $704
22,274
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$6,650
Cost:
$630
- - - - $6,650 1,064 -
-
kWh
-
-
kW-months/year
$6,650
1,064
MMBtu
04: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$5,182
Cost:
$8,000
- - $5,182 441 - - -
-
kWh
$5,182
441
kW-months/year
-
-
MMBtu
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$4,293
Cost:
$1,295
$4,293 38,101 - - - - $4,293
38,101
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$619
Cost:
-
- - - - $619 104 -
-
kWh
-
-
kW-months/year
$619
104
MMBtu
TOTAL RECOMMENDED Savings:
$26,731
Cost:
$78,435
$11,316 178,194 $8,146 1,021 $7,269 1,168 $11,316
178,194
kWh
$8,146
1,021
kW-months/year
$7,269
1,168
MMBtu
TOTAL IMPLEMENTED Savings:
$17,256
Cost:
$69,140
$7,023 140,093 $2,964 580 $7,269 1,168 $7,023
140,093
kWh
$2,964
580
kW-months/year
$7,269
1,168
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas