IAC Assessment: OK0066
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0066
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1982
Principal Product INJECTION-MOLDED PLASTIC
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 25
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 4,000
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $39,179 785,463 kWh $0.05
Natural Gas $1,550 457 MMBtu $3.39
TOTAL ENERGY COSTS $40,729
RECOMMENDED SAVINGS* $12,244 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,042
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$2,410
Cost:
$9,010
$2,410 87,046 - - $2,410
87,046
kWh
-
-
MMBtu
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$973
Cost:
$633
$973 35,170 - - $973
35,170
kWh
-
-
MMBtu
03: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$718
Cost:
$433
$718 - - - $718
-
kWh
-
-
MMBtu
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,042
Cost:
-
$1,042 37,808 - - $1,042
37,808
kWh
-
-
MMBtu
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,504
Cost:
$1,520
$1,504 - - - $1,504
-
kWh
-
-
MMBtu
06: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$56
Cost:
$114
$56 2,052 - - $56
2,052
kWh
-
-
MMBtu
07: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$5,173
Cost:
$24,000
$5,173 186,987 - - $5,173
186,987
kWh
-
-
MMBtu
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$69
Cost:
$296
- - $69 21 -
-
kWh
$69
21
MMBtu
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$263
Cost:
$95
$263 7,327 - - $263
7,327
kWh
-
-
MMBtu
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$36
Cost:
$38
$36 879 - - $36
879
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$12,244
Cost:
$36,139
$12,175 357,269 $69 21 $12,175
357,269
kWh
$69
21
MMBtu
TOTAL IMPLEMENTED Savings:
$1,042
Cost:
$929
$973 35,170 $69 21 $973
35,170
kWh
$69
21
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas