IAC logo
IAC Assessment: OK0067
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0067
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1982
Principal Product CLAY BRICK
NAICS n/a
SIC 3251 - Brick And Structural Clay Tile
Sales $1,000,000-$5,000,000
# of Employees 70
Plant Area (Sq.Ft.) 0
Annual Production 30,000,000 Pieces
Production Hrs. Annual 4,250
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $213,122 5,762,016 kWh $0.04
Natural Gas $1,060,787 349,283 MMBtu $3.04
TOTAL ENERGY COSTS $1,273,909
RECOMMENDED SAVINGS* $179,228 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $155,875
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$13,100
Cost:
$40,311
- - $13,100 3,970 -
-
kWh
$13,100
3,970
MMBtu
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$63,919
Cost:
$3,400
- - $63,919 19,370 -
-
kWh
$63,919
19,370
MMBtu
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$5,689
Cost:
$2,430
- - $5,689 1,724 -
-
kWh
$5,689
1,724
MMBtu
04: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$82,335
Cost:
$19,850
- - $82,335 24,950 -
-
kWh
$82,335
24,950
MMBtu
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,007
Cost:
$994
$1,007 27,550 - - $1,007
27,550
kWh
-
-
MMBtu
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$318
Cost:
$760
$318 6,741 - - $318
6,741
kWh
-
-
MMBtu
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,311
Cost:
$147
$3,311 123,974 - - $3,311
123,974
kWh
-
-
MMBtu
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$113
Cost:
$91
$113 4,103 - - $113
4,103
kWh
-
-
MMBtu
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,881
Cost:
$15,180
$6,881 163,247 - - $6,881
163,247
kWh
-
-
MMBtu
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,571
Cost:
$2,970
$1,571 37,222 - - $1,571
37,222
kWh
-
-
MMBtu
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$325
Cost:
$990
$325 7,327 - - $325
7,327
kWh
-
-
MMBtu
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$151
Cost:
$94
$151 3,517 - - $151
3,517
kWh
-
-
MMBtu
13: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$508
Cost:
$300
$508 14,068 - - $508
14,068
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$179,228
Cost:
$87,517
$14,185 387,749 $165,043 50,014 $14,185
387,749
kWh
$165,043
50,014
MMBtu
TOTAL IMPLEMENTED Savings:
$155,875
Cost:
$26,218
$3,932 142,145 $151,943 46,044 $3,932
142,145
kWh
$151,943
46,044
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas