IAC logo
IAC Assessment: OK0094
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0094
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1983
Principal Product RUBBER MOLDED PRODUCTS
NAICS n/a
SIC 3069 - Fabricated Rubber Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 86
Plant Area (Sq.Ft.) 0
Annual Production 5,000,000 Pieces
Production Hrs. Annual 3,750
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $38,400 784,291 kWh $0.05
Natural Gas $39,950 11,416 MMBtu $3.50
TOTAL ENERGY COSTS $78,350
RECOMMENDED SAVINGS* $5,564 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,944
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$764
Cost:
$183
$764 18,171 - - $764
18,171
kWh
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$19
Cost:
$45
$19 586 - - $19
586
kWh
-
-
MMBtu
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$988
Cost:
$800
- - $988 324 -
-
kWh
$988
324
MMBtu
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$2,438
Cost:
$1,127
- - $2,438 1,400 -
-
kWh
$2,438
1,400
MMBtu
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$728
Cost:
$545
$728 - - - $728
-
kWh
-
-
MMBtu
06: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$263
Cost:
$200
- - $263 86 -
-
kWh
$263
86
MMBtu
07: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$24
Cost:
$30
- - $24 8 -
-
kWh
$24
8
MMBtu
08: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$156
Cost:
$47
- - $156 51 -
-
kWh
$156
51
MMBtu
09: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$87
Cost:
$51
- - $87 29 -
-
kWh
$87
29
MMBtu
10: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$97
Cost:
$49
- - $97 32 -
-
kWh
$97
32
MMBtu
TOTAL RECOMMENDED Savings:
$5,564
Cost:
$3,077
$1,511 18,757 $4,053 1,930 $1,511
18,757
kWh
$4,053
1,930
MMBtu
TOTAL IMPLEMENTED Savings:
$2,944
Cost:
$1,425
- - $2,944 1,566 -
-
kWh
$2,944
1,566
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas