IAC logo
IAC Assessment: OK0095
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0095
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1983
Principal Product LINGERIE
NAICS n/a
SIC 2341 - Women's, Misses', Children's, and Infants' Underwear and Nightwear
Sales $1,000,000-$5,000,000
# of Employees 300
Plant Area (Sq.Ft.) 0
Annual Production 93,600 Pieces
Production Hrs. Annual 2,340
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $30,082 544,842 kWh $0.06
Natural Gas $11,819 3,610 MMBtu $3.27
TOTAL ENERGY COSTS $41,901
RECOMMENDED SAVINGS* $7,282 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$147
Cost:
$250
- - $147 42 -
-
kWh
$147
42
MMBtu
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$4,400
Cost:
$154
$1,212 37,515 $3,188 912 $1,212
37,515
kWh
$3,188
912
MMBtu
03: 2.7227 USE WATER ON AIR CONDITIONING EXCHANGER TO IMPROVE HEAT TRANSFER AND INCREASE AIR CONDITIONER EFFICIENCY Savings:
$806
Cost:
$1,825
$806 24,912 - - $806
24,912
kWh
-
-
MMBtu
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$345
Cost:
$193
$121 3,810 $224 64 $121
3,810
kWh
$224
64
MMBtu
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$196
Cost:
$165
$196 4,689 - - $196
4,689
kWh
-
-
MMBtu
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$858
Cost:
$169
$858 19,343 - - $858
19,343
kWh
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$530
Cost:
$428
$530 9,086 - - $530
9,086
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$7,282
Cost:
$3,184
$3,723 99,355 $3,559 1,018 $3,723
99,355
kWh
$3,559
1,018
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas