IAC logo
IAC Assessment: OK0106
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0106
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1983
Principal Product BRICKS
NAICS n/a
SIC 3255 - Clay Refractories
Sales $5,000,000-$10,000,000
# of Employees 75
Plant Area (Sq.Ft.) 0
Annual Production 44,000,000 Pieces
Production Hrs. Annual 8,736
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $138,485 3,449,883 kWh $0.04
Natural Gas $313,452 91,468 MMBtu $3.43
TOTAL ENERGY COSTS $451,937
RECOMMENDED SAVINGS* $76,922 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $76,823
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$35,511
Cost:
$1,133
- - $35,511 11,010 -
-
kWh
$35,511
11,010
MMBtu
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$99
Cost:
$148
$99 2,638 - - $99
2,638
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$109
Cost:
$73
$109 2,345 - - $109
2,345
kWh
-
-
MMBtu
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$3,552
Cost:
$3,810
$3,552 109,613 - - $3,552
109,613
kWh
-
-
MMBtu
09: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,084
Cost:
$2,528
$2,084 58,617 - - $2,084
58,617
kWh
-
-
MMBtu
10: 2.8122 USE UTILITY CONTROLLED POWER MANAGEMENT Savings:
$6,953
Cost:
-
$6,953 39,859 - - $6,953
39,859
kWh
-
-
MMBtu
11: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$68
Cost:
-
$68 2,638 - - $68
2,638
kWh
-
-
MMBtu
12: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$28,546
Cost:
$6,480
- - $28,546 8,850 -
-
kWh
$28,546
8,850
MMBtu
TOTAL RECOMMENDED Savings:
$76,922
Cost:
$14,172
$12,865 215,710 $64,057 19,860 $12,865
215,710
kWh
$64,057
19,860
MMBtu
TOTAL IMPLEMENTED Savings:
$76,823
Cost:
$14,024
$12,766 213,072 $64,057 19,860 $12,766
213,072
kWh
$64,057
19,860
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas