IAC logo
IAC Assessment: OK0137
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0137
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1984
Principal Product MILK,ICE CREAM,COTTAGE CHEESE
NAICS n/a
SIC 2026 - Fluid Milk
Sales $5,000,000-$10,000,000
# of Employees 85
Plant Area (Sq.Ft.) 0
Annual Production 14,300,000 Pounds
Production Hrs. Annual 0
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $81,658 1,810,082 kWh $0.05
Natural Gas $25,758 6,900 MMBtu $3.73
Other Energy $168,960 17,572 MMBtu $9.62
TOTAL ENERGY COSTS $276,376
RECOMMENDED SAVINGS* $123,081 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,269
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Energy Electricity Usage Natural Gas Other Energy
$ kWh $ MMBtu $ MMBtu
01: 2.1335 REPLACE GASOLINE WITH DIESEL, LPG, OR NATURAL GAS Savings:
$121,449
Cost:
$176,369
- - $(-47,511) (-17,572) $168,960 17,572 -
-
kWh
$(-47,511)
(-17,572)
MMBtu
$168,960
17,572
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$135
Cost:
$125
$135 2,931 - - - - $135
2,931
kWh
-
-
MMBtu
-
-
MMBtu
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$140
Cost:
$350
- - $140 40 - - -
-
kWh
$140
40
MMBtu
-
-
MMBtu
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$363
Cost:
-
$363 7,620 - - - - $363
7,620
kWh
-
-
MMBtu
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$363
Cost:
$104
$363 8,206 - - - - $363
8,206
kWh
-
-
MMBtu
-
-
MMBtu
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$631
Cost:
$15
$40 1,172 $591 168 - - $40
1,172
kWh
$591
168
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$123,081
Cost:
$176,963
$901 19,929 $(-46,780) (-17,364) $168,960 17,572 $901
19,929
kWh
$(-46,780)
(-17,364)
MMBtu
$168,960
17,572
MMBtu
TOTAL IMPLEMENTED Savings:
$1,269
Cost:
$490
$538 11,723 $731 208 - - $538
11,723
kWh
$731
208
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Natural Gas Other Energy Electricity Usage Natural Gas Other Energy