Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 1985 |
Principal Product | REFRIGERANTS |
NAICS | n/a |
SIC | 2813 - Industrial Gases |
Sales | $50,000,000-$100,000,000 |
# of Employees | 45 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 48,000,000 Pounds |
Production Hrs. Annual | 8,736 |
Location (State) | MO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $672,927 | 15,669,989 | kWh | $0.04 |
Other Energy | $635,005 | 141,486 | MMBtu | $4.49 |
TOTAL ENERGY COSTS | $1,307,932 | |||
RECOMMENDED SAVINGS* | $989,099 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $987,048 |
#|Description |
Savings Cost |
Status | Electricity Usage | Other Energy | Administrative Changes | Electricity Usage | Other Energy | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER |
Savings: $13,315 Cost: $12,158 |
$(-85) | (-2,052) | $13,400 | 2,196 | - | - |
$(-85) (-2,052) kWh |
$13,400 2,196 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $1,917 Cost: $500 |
- | - | $1,917 | 365 | - | - |
- - kWh |
$1,917 365 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $850 Cost: - |
$850 | 13,482 | - | - | - | - |
$850 13,482 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,201 Cost: $546 |
$1,201 | 19,050 | - | - | - | - |
$1,201 19,050 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $661 Cost: $1,142 |
$614 | 15,826 | - | - | $47 | - |
$614 15,826 kWh |
- - MMBtu |
$47 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $1,402 Cost: $410 |
$1,402 | 24,912 | - | - | - | - |
$1,402 24,912 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,382 Cost: $891 |
$1,382 | 35,463 | - | - | - | - |
$1,382 35,463 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $4,324 Cost: $171 |
$424 | 16,413 | $3,900 | 714 | - | - |
$424 16,413 kWh |
$3,900 714 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.3411 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT |
Savings: $4,309 Cost: $13,674 |
$7,218 | 206,917 | $(-2,909) | (-639) | - | - |
$7,218 206,917 kWh |
$(-2,909) (-639) MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.3416 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST |
Savings: $959,738 Cost: $1,018,080 |
$408,620 | 14,886,577 | $603,255 | 134,412 | $(-52,137) | - |
$408,620 14,886,577 kWh |
$603,255 134,412 MMBtu |
$(-52,137) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $989,099 Cost: $1,047,572 |
$421,626 | 15,216,588 | $619,563 | 137,048 | $(-52,090) | - | $421,626 15,216,588 kWh |
$619,563 137,048 MMBtu |
$(-52,090) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $987,048 Cost: $1,047,026 |
$419,575 | 15,184,056 | $619,563 | 137,048 | $(-52,090) | - | $419,575 15,184,056 kWh |
$619,563 137,048 MMBtu |
$(-52,090) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Other Energy | Administrative Changes | Electricity Usage | Other Energy | Administrative Changes |