IAC logo
IAC Assessment: OK0157
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0157
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1985
Principal Product DISPOSABLE CAPS & GOWNS
NAICS n/a
SIC 2389 - Apparel And Accessories, Nec
Sales $1,000,000-$5,000,000
# of Employees 52
Plant Area (Sq.Ft.) 0
Annual Production 400,000 Pieces
Production Hrs. Annual 2,250
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $16,030 216,002 kWh $0.07
Natural Gas $8,255 1,705 MMBtu $4.84
TOTAL ENERGY COSTS $24,285
RECOMMENDED SAVINGS* $5,470 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,470
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,475
Cost:
$201
$1,475 19,930 - - - - $1,475
19,930
kWh
-
-
MMBtu
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$327
Cost:
$81
$327 4,396 - - - - $327
4,396
kWh
-
-
MMBtu
-
-
$
03: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$373
Cost:
$87
- - $373 77 - - -
-
kWh
$373
77
MMBtu
-
-
$
04: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$557
Cost:
$584
- - $577 119 $(-20) - -
-
kWh
$577
119
MMBtu
$(-20)
-
$
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,705
Cost:
$620
- - $1,736 358 $(-31) - -
-
kWh
$1,736
358
MMBtu
$(-31)
-
$
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$902
Cost:
$165
- - $902 186 - - -
-
kWh
$902
186
MMBtu
-
-
$
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$131
Cost:
$500
- - $131 27 - - -
-
kWh
$131
27
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$5,470
Cost:
$2,238
$1,802 24,326 $3,719 767 $(-51) - $1,802
24,326
kWh
$3,719
767
MMBtu
$(-51)
-
$
TOTAL IMPLEMENTED Savings:
$5,470
Cost:
$2,238
$1,802 24,326 $3,719 767 $(-51) - $1,802
24,326
kWh
$3,719
767
MMBtu
$(-51)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes