IAC Assessment: OK0169
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0169
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1985
Principal Product AIR CONDITIONING UNITS
NAICS n/a
SIC 3585 - Refrigeration And Heating Equipment
Sales $5,000,000-$10,000,000
# of Employees 550
Plant Area (Sq.Ft.) 0
Annual Production 4,000 Pieces
Production Hrs. Annual 4,400
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $775,141 18,492,966 kWh $0.04
Natural Gas $207,334 57,021 MMBtu $3.64
TOTAL ENERGY COSTS $982,475
RECOMMENDED SAVINGS* $80,879 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $49,143
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$9,330
Cost:
$292
$9,330 - - - - - $9,330
-
kWh
-
-
MMBtu
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$3,030
Cost:
$1,500
- - $3,030 828 - - -
-
kWh
$3,030
828
MMBtu
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$231
Cost:
$842
- - $231 63 - - -
-
kWh
$231
63
MMBtu
-
-
$
04: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$245
Cost:
$228
- - $245 67 - - -
-
kWh
$245
67
MMBtu
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$62
Cost:
$120
- - $62 17 - - -
-
kWh
$62
17
MMBtu
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,930
Cost:
$4,780
- - $4,930 1,347 - - -
-
kWh
$4,930
1,347
MMBtu
-
-
$
07: 2.6232 INSTALL SET-BACK TIMERS Savings:
$2,001
Cost:
$222
$2,001 47,479 - - - - $2,001
47,479
kWh
-
-
MMBtu
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$860
Cost:
$631
$860 26,964 - - - - $860
26,964
kWh
-
-
MMBtu
-
-
$
09: 3.5314 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE Savings:
$29,355
Cost:
$6,000
$284 6,155 - - $29,071 - $284
6,155
kWh
-
-
MMBtu
$29,071
-
$
10: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$2,381
Cost:
-
$(-72) (-1,465) $1,454 144 $999 - $(-72)
(-1,465)
kWh
$1,454
144
MMBtu
$999
-
$
11: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$23,457
Cost:
$1,100
- - $23,457 6,409 - - -
-
kWh
$23,457
6,409
MMBtu
-
-
$
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,997
Cost:
$8,550
$3,987 94,666 - - $1,010 - $3,987
94,666
kWh
-
-
MMBtu
$1,010
-
$
TOTAL RECOMMENDED Savings:
$80,879
Cost:
$24,265
$16,390 173,799 $33,409 8,875 $31,080 - $16,390
173,799
kWh
$33,409
8,875
MMBtu
$31,080
-
$
TOTAL IMPLEMENTED Savings:
$49,143
Cost:
$18,265
$16,178 169,109 $31,955 8,731 $1,010 - $16,178
169,109
kWh
$31,955
8,731
MMBtu
$1,010
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes