IAC Assessment: OK0189
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0189
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1986
Principal Product OILS & GREASES (BLENDING)
NAICS n/a
SIC 2992 - Lubricating Oils And Greases
Sales $50,000,000-$100,000,000
# of Employees 200
Plant Area (Sq.Ft.) 0
Annual Production 168,000 BBL
Production Hrs. Annual 0
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $146,361 2,413,540 kWh $0.06
Natural Gas $252,609 65,545 MMBtu $3.85
TOTAL ENERGY COSTS $398,970
RECOMMENDED SAVINGS* $44,861 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,281
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,573
Cost:
$2,082
$4,573 68,288 - - $4,573
68,288
kWh
-
-
MMBtu
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$3,617
Cost:
-
- - $3,617 942 -
-
kWh
$3,617
942
MMBtu
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$4,105
Cost:
$5,300
- - $4,105 1,111 -
-
kWh
$4,105
1,111
MMBtu
04: 2.3413 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT Savings:
$16,774
Cost:
$35,620
$20,499 318,288 $(-3,725) (-1,008) $20,499
318,288
kWh
$(-3,725)
(-1,008)
MMBtu
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$5,672
Cost:
$21,000
- - $5,672 1,535 -
-
kWh
$5,672
1,535
MMBtu
06: 2.2124 INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK Savings:
$6,444
Cost:
$30,000
- - $6,444 1,744 -
-
kWh
$6,444
1,744
MMBtu
07: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$986
Cost:
$2,550
- - $986 267 -
-
kWh
$986
267
MMBtu
08: 2.2514 COVER OPEN TANKS Savings:
$2,690
Cost:
$533
- - $2,690 728 -
-
kWh
$2,690
728
MMBtu
TOTAL RECOMMENDED Savings:
$44,861
Cost:
$97,085
$25,072 386,576 $19,789 5,319 $25,072
386,576
kWh
$19,789
5,319
MMBtu
TOTAL IMPLEMENTED Savings:
$13,281
Cost:
$9,932
$4,573 68,288 $8,708 2,320 $4,573
68,288
kWh
$8,708
2,320
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas