IAC Assessment: OK0190
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0190
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1986
Principal Product OILWELL & CENTRIFUGAL PUMPS
NAICS n/a
SIC 3533 - Oil And Gas Field Machinery
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 0
Annual Production 1,000 Pieces
Production Hrs. Annual 4,420
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $145,351 2,744,138 kWh $0.05
Natural Gas $9,570 2,126 MMBtu $4.50
TOTAL ENERGY COSTS $154,921
RECOMMENDED SAVINGS* $21,278 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,350
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,326
Cost:
$229
$1,326 23,740 - - $1,326
23,740
kWh
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$706
Cost:
$80
$706 16,413 - - $706
16,413
kWh
-
-
MMBtu
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$5,318
Cost:
-
$2,420 55,979 $2,898 644 $2,420
55,979
kWh
$2,898
644
MMBtu
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,159
Cost:
$12,400
$4,159 - - - $4,159
-
kWh
-
-
MMBtu
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$388
Cost:
$1,600
$388 - - - $388
-
kWh
-
-
MMBtu
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$9,381
Cost:
-
$9,381 - - - $9,381
-
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$21,278
Cost:
$14,309
$18,380 96,132 $2,898 644 $18,380
96,132
kWh
$2,898
644
MMBtu
TOTAL IMPLEMENTED Savings:
$7,350
Cost:
$309
$4,452 96,132 $2,898 644 $4,452
96,132
kWh
$2,898
644
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas