IAC Assessment: OK0221
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0221
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1987
Principal Product CONCRETE AND ASPHALT
NAICS n/a
SIC 3273 - Ready-mixed Concrete
Sales $10,000,000-$50,000,000
# of Employees 275
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 2,600
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $33,076 489,742 kWh $0.07
Natural Gas $11,332 2,510 MMBtu $4.51
TOTAL ENERGY COSTS $44,408
RECOMMENDED SAVINGS* $3,178 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,911
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$559
Cost:
$700
- - $559 124 - - -
-
kWh
$559
124
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$79
Cost:
$128
$59 1,465 - - $20 - $59
1,465
kWh
-
-
MMBtu
$20
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$98
Cost:
$62
$109 1,758 $(-11) (-2) - - $109
1,758
kWh
$(-11)
(-2)
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$270
Cost:
$10
$270 6,448 - - - - $270
6,448
kWh
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$165
Cost:
$288
$165 3,517 - - - - $165
3,517
kWh
-
-
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,166
Cost:
-
$1,236 29,308 - - $(-70) - $1,236
29,308
kWh
-
-
MMBtu
$(-70)
-
$
07: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$162
Cost:
$100
$162 3,517 - - - - $162
3,517
kWh
-
-
MMBtu
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$412
Cost:
$344
$412 6,448 - - - - $412
6,448
kWh
-
-
MMBtu
-
-
$
09: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$267
Cost:
$100
$267 2,052 - - - - $267
2,052
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$3,178
Cost:
$1,732
$2,680 54,513 $548 122 $(-50) - $2,680
54,513
kWh
$548
122
MMBtu
$(-50)
-
$
TOTAL IMPLEMENTED Savings:
$2,911
Cost:
$1,632
$2,413 52,461 $548 122 $(-50) - $2,413
52,461
kWh
$548
122
MMBtu
$(-50)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes