IAC logo
IAC Assessment: OK0225
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0225
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1987
Principal Product PHOTOPROCESSING SYSTEMS
NAICS n/a
SIC 3861 - Photographic Equipment And Supplies
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 2,500
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $194,796 2,199,004 kWh $0.09
Natural Gas $38,570 11,086 MMBtu $3.48
TOTAL ENERGY COSTS $233,366
RECOMMENDED SAVINGS* $9,411 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,333
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$886
Cost:
$220
$886 5,275 - - - - $886
5,275
kWh
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$332
Cost:
$1,101
$332 1,758 - - - - $332
1,758
kWh
-
-
MMBtu
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$71
Cost:
$125
$71 879 - - - - $71
879
kWh
-
-
MMBtu
-
-
$
04: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$4,851
Cost:
$16,900
- - $4,851 1,394 - - -
-
kWh
$4,851
1,394
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,012
Cost:
-
$2,132 31,360 - - $(-120) - $2,132
31,360
kWh
-
-
MMBtu
$(-120)
-
$
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,078
Cost:
$5,558
- - $1,078 310 - - -
-
kWh
$1,078
310
MMBtu
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$181
Cost:
$500
- - $181 52 - - -
-
kWh
$181
52
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$9,411
Cost:
$24,404
$3,421 39,272 $6,110 1,756 $(-120) - $3,421
39,272
kWh
$6,110
1,756
MMBtu
$(-120)
-
$
TOTAL IMPLEMENTED Savings:
$8,333
Cost:
$18,846
$3,421 39,272 $5,032 1,446 $(-120) - $3,421
39,272
kWh
$5,032
1,446
MMBtu
$(-120)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes