IAC Assessment: OK0240
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0240
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1987
Principal Product DRILL. PUMP COMPONENTS
NAICS n/a
SIC 3533 - Oil And Gas Field Machinery
Sales $5,000,000-$10,000,000
# of Employees 300
Plant Area (Sq.Ft.) 0
Annual Production 12,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $327,342 6,578,546 kWh $0.05
Natural Gas $85,437 19,548 MMBtu $4.37
TOTAL ENERGY COSTS $412,779
RECOMMENDED SAVINGS* $14,017 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,017
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$2,147
Cost:
$5,000
- - $2,147 491 - - -
-
kWh
$2,147
491
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,153
Cost:
-
$1,233 34,877 - - $(-80) - $1,233
34,877
kWh
-
-
MMBtu
$(-80)
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,092
Cost:
-
$1,092 24,033 - - - - $1,092
24,033
kWh
-
-
MMBtu
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$576
Cost:
$353
$576 12,603 - - - - $576
12,603
kWh
-
-
MMBtu
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$561
Cost:
$240
$561 15,826 - - - - $561
15,826
kWh
-
-
MMBtu
-
-
$
06: 2.2514 COVER OPEN TANKS Savings:
$1,626
Cost:
$269
$1,626 46,014 - - - - $1,626
46,014
kWh
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,858
Cost:
$1,215
$4,858 104,045 - - - - $4,858
104,045
kWh
-
-
MMBtu
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,004
Cost:
$3,000
$2,004 42,790 - - - - $2,004
42,790
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$14,017
Cost:
$10,077
$11,950 280,188 $2,147 491 $(-80) - $11,950
280,188
kWh
$2,147
491
MMBtu
$(-80)
-
$
TOTAL IMPLEMENTED Savings:
$14,017
Cost:
$10,077
$11,950 280,188 $2,147 491 $(-80) - $11,950
280,188
kWh
$2,147
491
MMBtu
$(-80)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes