IAC Assessment: OK0279
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0279
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1989
Principal Product POULTRY BY-PRODUCT MEAL
NAICS n/a
SIC 2048 - Prepared Feeds, Nec
Sales $10,000,000-$50,000,000
# of Employees 19
Plant Area (Sq.Ft.) 0
Annual Production 2,000 Tons
Production Hrs. Annual 6,864
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $193,482 4,400,059 kWh $0.04
Natural Gas $505,785 185,075 MMBtu $2.73
TOTAL ENERGY COSTS $699,267
RECOMMENDED SAVINGS* $115,000 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $57,049
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,397
Cost:
$3,483
$1,704 48,066 - - $(-307) - $1,704
48,066
kWh
-
-
MMBtu
$(-307)
-
$
02: 2.6232 INSTALL SET-BACK TIMERS Savings:
$506
Cost:
$400
$506 11,430 - - - - $506
11,430
kWh
-
-
MMBtu
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,236
Cost:
$2,512
- - $2,236 819 - - -
-
kWh
$2,236
819
MMBtu
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$5,203
Cost:
$2,516
- - $5,203 1,906 - - -
-
kWh
$5,203
1,906
MMBtu
-
-
$
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$15,708
Cost:
$10,392
- - $15,708 5,754 - - -
-
kWh
$15,708
5,754
MMBtu
-
-
$
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$15,332
Cost:
$1,500
- - $15,332 5,616 - - -
-
kWh
$15,332
5,616
MMBtu
-
-
$
07: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$22,796
Cost:
-
- - $22,796 8,350 - - -
-
kWh
$22,796
8,350
MMBtu
-
-
$
08: 2.3511 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS Savings:
$18,520
Cost:
$38,000
$18,520 - - - - - $18,520
-
kWh
-
-
MMBtu
-
-
$
09: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$697
Cost:
$513
$697 18,464 - - - - $697
18,464
kWh
-
-
MMBtu
-
-
$
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,992
Cost:
-
$1,992 52,755 - - - - $1,992
52,755
kWh
-
-
MMBtu
-
-
$
11: 3.4151 MINIMIZE WATER USAGE Savings:
$15,726
Cost:
$4,050
- - $14,144 5,181 $1,582 - -
-
kWh
$14,144
5,181
MMBtu
$1,582
-
$
12: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$14,887
Cost:
$7,200
- - $14,887 5,453 - - -
-
kWh
$14,887
5,453
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$115,000
Cost:
$70,566
$23,419 130,715 $90,306 33,079 $1,275 - $23,419
130,715
kWh
$90,306
33,079
MMBtu
$1,275
-
$
TOTAL IMPLEMENTED Savings:
$57,049
Cost:
$6,463
$3,195 82,649 $52,272 19,147 $1,582 - $3,195
82,649
kWh
$52,272
19,147
MMBtu
$1,582
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes