IAC logo
IAC Assessment: OK0280
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0280
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1989
Principal Product PROCESSED PORK & BEEF
NAICS n/a
SIC 2011 - Meat Packing Plants
Sales $10,000,000-$50,000,000
# of Employees 45
Plant Area (Sq.Ft.) 0
Annual Production 8,000,000 Pounds
Production Hrs. Annual 5,000
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $54,375 1,085,580 kWh $0.05
Natural Gas $44,433 11,107 MMBtu $4.00
TOTAL ENERGY COSTS $98,808
RECOMMENDED SAVINGS* $12,103 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,833
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION Savings:
$3,000
Cost:
$4,600
- - $3,200 800 $(-200) - -
-
kWh
$3,200
800
MMBtu
$(-200)
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$782
Cost:
$231
$782 16,706 - - - - $782
16,706
kWh
-
-
MMBtu
-
-
$
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$6,280
Cost:
$893
- - $6,280 1,570 - - -
-
kWh
$6,280
1,570
MMBtu
-
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,270
Cost:
$3,200
$1,270 - - - - - $1,270
-
kWh
-
-
MMBtu
-
-
$
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$272
Cost:
-
$272 4,689 - - - - $272
4,689
kWh
-
-
MMBtu
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$499
Cost:
$602
$499 11,137 - - - - $499
11,137
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$12,103
Cost:
$9,526
$2,823 32,532 $9,480 2,370 $(-200) - $2,823
32,532
kWh
$9,480
2,370
MMBtu
$(-200)
-
$
TOTAL IMPLEMENTED Savings:
$10,833
Cost:
$6,326
$1,553 32,532 $9,480 2,370 $(-200) - $1,553
32,532
kWh
$9,480
2,370
MMBtu
$(-200)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes