IAC logo
IAC Assessment: OK0285
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0285
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1989
Principal Product MOTION & SLEEP MECHANISM
NAICS n/a
SIC 3469 - Metal Stampings, Nec
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 0
Annual Production 24,000,000 Pounds
Production Hrs. Annual 8,736
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $182,543 3,728,898 kWh $0.05
Natural Gas $85,549 28,187 MMBtu $3.04
TOTAL ENERGY COSTS $268,092
RECOMMENDED SAVINGS* $30,520 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,520
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,402
Cost:
$3,870
$1,741 53,341 - - $(-339) - $1,741
53,341
kWh
-
-
MMBtu
$(-339)
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$486
Cost:
$872
$486 14,947 - - - - $486
14,947
kWh
-
-
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,367
Cost:
-
$1,467 59,496 - - $(-100) - $1,467
59,496
kWh
-
-
MMBtu
$(-100)
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$7,072
Cost:
$98
- - $7,072 2,373 - - -
-
kWh
$7,072
2,373
MMBtu
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,244
Cost:
$1,161
- - $2,244 753 - - -
-
kWh
$2,244
753
MMBtu
-
-
$
06: 2.3511 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS Savings:
$13,643
Cost:
$31,400
$13,643 (-10,844) - - - - $13,643
(-10,844)
kWh
-
-
MMBtu
-
-
$
07: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$4,306
Cost:
$390
- - $4,306 1,445 - - -
-
kWh
$4,306
1,445
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$30,520
Cost:
$37,791
$17,337 116,940 $13,622 4,571 $(-439) - $17,337
116,940
kWh
$13,622
4,571
MMBtu
$(-439)
-
$
TOTAL IMPLEMENTED Savings:
$30,520
Cost:
$37,791
$17,337 116,940 $13,622 4,571 $(-439) - $17,337
116,940
kWh
$13,622
4,571
MMBtu
$(-439)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes