IAC Assessment: OK0289
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0289
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1989
Principal Product HARD CANDY
NAICS n/a
SIC 2064 - Candy & Other Confectionery Products
Sales $5,000,000-$10,000,000
# of Employees 120
Plant Area (Sq.Ft.) 0
Annual Production 245,000 Pieces
Production Hrs. Annual 4,160
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $55,608 1,092,907 kWh $0.05
Natural Gas $41,291 11,288 MMBtu $3.66
TOTAL ENERGY COSTS $96,899
RECOMMENDED SAVINGS* $5,771 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,499
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$658
Cost:
$239
$658 13,775 - - $658
13,775
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,469
Cost:
$719
$1,469 30,774 - - $1,469
30,774
kWh
-
-
MMBtu
03: 2.1222 INSTALL TURBULATORS Savings:
$632
Cost:
$1,350
- - $632 212 -
-
kWh
$632
212
MMBtu
04: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$114
Cost:
$135
- - $114 39 -
-
kWh
$114
39
MMBtu
05: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$81
Cost:
$129
- - $81 27 -
-
kWh
$81
27
MMBtu
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$161
Cost:
$250
- - $161 54 -
-
kWh
$161
54
MMBtu
07: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$1,579
Cost:
$1,110
$1,579 50,703 - - $1,579
50,703
kWh
-
-
MMBtu
08: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,077
Cost:
$1,710
$544 17,585 $533 179 $544
17,585
kWh
$533
179
MMBtu
TOTAL RECOMMENDED Savings:
$5,771
Cost:
$5,642
$4,250 112,837 $1,521 511 $4,250
112,837
kWh
$1,521
511
MMBtu
TOTAL IMPLEMENTED Savings:
$4,499
Cost:
$3,668
$3,706 95,252 $793 266 $3,706
95,252
kWh
$793
266
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas