IAC logo
IAC Assessment: OK0302
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0302
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1989
Principal Product MOLDED RUBBER PRODUCTS
NAICS n/a
SIC 3069 - Fabricated Rubber Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 120
Plant Area (Sq.Ft.) 0
Annual Production 51,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $71,268 1,507,034 kWh $0.05
Natural Gas $5,265 1,207 MMBtu $4.36
TOTAL ENERGY COSTS $76,533
RECOMMENDED SAVINGS* $3,012 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $991
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$484
Cost:
$167
$484 10,551 - - - - $484
10,551
kWh
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$491
Cost:
$640
$242 4,103 - - $249 - $242
4,103
kWh
-
-
MMBtu
$249
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$134
Cost:
$280
$134 2,931 - - - - $134
2,931
kWh
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$310
Cost:
$487
$417 8,499 - - $(-107) - $417
8,499
kWh
-
-
MMBtu
$(-107)
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$373
Cost:
$630
- - $373 94 - - -
-
kWh
$373
94
MMBtu
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$265
Cost:
$120
$265 9,086 - - - - $265
9,086
kWh
-
-
MMBtu
-
-
$
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$955
Cost:
$2,600
$955 17,585 - - - - $955
17,585
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$3,012
Cost:
$4,924
$2,497 52,755 $373 94 $142 - $2,497
52,755
kWh
$373
94
MMBtu
$142
-
$
TOTAL IMPLEMENTED Savings:
$991
Cost:
$1,077
$618 13,482 $373 94 - - $618
13,482
kWh
$373
94
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $