IAC logo
IAC Assessment: OK0306
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0306
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1990
Principal Product CAM & GROOVE COUPLINGS
NAICS n/a
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 230
Plant Area (Sq.Ft.) 0
Annual Production 1,200,000 Pieces
Production Hrs. Annual 6,240
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $241,437 3,849,062 kWh $0.06
Natural Gas $63,633 23,158 MMBtu $2.75
TOTAL ENERGY COSTS $305,070
RECOMMENDED SAVINGS* $47,760 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,413
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,969
Cost:
$27,903
$14,969 309,203 - - - - $14,969
309,203
kWh
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$859
Cost:
$640
$859 18,464 - - - - $859
18,464
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$110
Cost:
$102
$110 1,465 - - - - $110
1,465
kWh
-
-
MMBtu
-
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$18,384
Cost:
-
$41,472 - - - $(-23,088) - $41,472
-
kWh
-
-
MMBtu
$(-23,088)
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$10,716
Cost:
$16,250
$10,716 - - - - - $10,716
-
kWh
-
-
MMBtu
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$810
Cost:
$1,300
$810 17,585 - - - - $810
17,585
kWh
-
-
MMBtu
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,419
Cost:
-
$1,719 48,652 - - $(-300) - $1,719
48,652
kWh
-
-
MMBtu
$(-300)
-
$
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$493
Cost:
$150
- - $493 180 - - -
-
kWh
$493
180
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$47,760
Cost:
$46,345
$70,655 395,369 $493 180 $(-23,388) - $70,655
395,369
kWh
$493
180
MMBtu
$(-23,388)
-
$
TOTAL IMPLEMENTED Savings:
$1,413
Cost:
$1,552
$920 19,050 $493 180 - - $920
19,050
kWh
$493
180
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes