IAC Assessment: OK0334
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0334
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1991
Principal Product GLASS CONTAINERS
NAICS n/a
SIC 3221 - Glass Containers
Sales $10,000,000-$50,000,000
# of Employees 360
Plant Area (Sq.Ft.) 0
Annual Production 96,000 Tons
Production Hrs. Annual 8,736
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $676,653 38,813,893 kWh $0.02
Natural Gas $1,575,423 921,577 MMBtu $1.71
TOTAL ENERGY COSTS $2,252,076
RECOMMENDED SAVINGS* $276,953 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,555
Cost:
-
$1,654 54,220 - - $(-99) - $1,654
54,220
kWh
-
-
MMBtu
$(-99)
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,330
Cost:
$1,330
$1,330 59,203 - - - - $1,330
59,203
kWh
-
-
MMBtu
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$68,612
Cost:
$56,631
$68,612 3,060,375 - - - - $68,612
3,060,375
kWh
-
-
MMBtu
-
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$50,672
Cost:
-
$106,056 4,730,363 $(-55,384) (-28,575) - - $106,056
4,730,363
kWh
$(-55,384)
(-28,575)
MMBtu
-
-
$
05: 2.3416 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST Savings:
$153,237
Cost:
-
$301,935 9,898,886 $(-128,358) (-66,226) $(-20,340) - $301,935
9,898,886
kWh
$(-128,358)
(-66,226)
MMBtu
$(-20,340)
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,547
Cost:
-
$1,547 50,703 - - - - $1,547
50,703
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$276,953
Cost:
$57,961
$481,134 17,853,750 $(-183,742) (-94,801) $(-20,439) - $481,134
17,853,750
kWh
$(-183,742)
(-94,801)
MMBtu
$(-20,439)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes