IAC logo
IAC Assessment: OK0336
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0336
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1991
Principal Product NEWSPAPER PUBLISHING
NAICS n/a
SIC 2752 - Commercial Printing, Lithographic
Sales $50,000,000-$100,000,000
# of Employees 800
Plant Area (Sq.Ft.) 0
Annual Production 90,000,000 Pieces
Production Hrs. Annual 8,736
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $511,791 10,447,245 kWh $0.05
Natural Gas $64,653 14,773 MMBtu $4.38
TOTAL ENERGY COSTS $576,444
RECOMMENDED SAVINGS* $85,762 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $85,762
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$53,033
Cost:
-
$53,033 1,545,721 - - $53,033
1,545,721
kWh
-
-
MMBtu
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$7,157
Cost:
$7,830
$7,157 208,675 - - $7,157
208,675
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,221
Cost:
$7,915
$11,221 275,791 - - $11,221
275,791
kWh
-
-
MMBtu
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$11,632
Cost:
$10,000
$11,632 - - - $11,632
-
kWh
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,951
Cost:
-
$1,951 45,135 - - $1,951
45,135
kWh
-
-
MMBtu
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$768
Cost:
-
- - $768 175 -
-
kWh
$768
175
MMBtu
TOTAL RECOMMENDED Savings:
$85,762
Cost:
$25,745
$84,994 2,075,322 $768 175 $84,994
2,075,322
kWh
$768
175
MMBtu
TOTAL IMPLEMENTED Savings:
$85,762
Cost:
$25,745
$84,994 2,075,322 $768 175 $84,994
2,075,322
kWh
$768
175
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas