IAC Assessment: OK0399
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0399
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1993
Principal Product Rebuilt Engines
NAICS n/a
SIC 3519 - Internal Combustion Engines, Nec
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 144,000
Annual Production 280,000 Pieces
Production Hrs. Annual 4,420
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $85,073 1,265,827 kWh $0.07
Natural Gas $71,061 15,064 MMBtu $4.72
TOTAL ENERGY COSTS $156,134
RECOMMENDED SAVINGS* $40,602 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,672
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$662
Cost:
-
$662 20,809 - - $662
20,809
kWh
-
-
MMBtu
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$133
Cost:
$452
- - $133 32 -
-
kWh
$133
32
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,239
Cost:
$3,560
$3,239 29,601 - - $3,239
29,601
kWh
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$829
Cost:
$546
$829 11,137 - - $829
11,137
kWh
-
-
MMBtu
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,137
Cost:
-
$1,137 16,706 - - $1,137
16,706
kWh
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,418
Cost:
$10,680
$5,418 69,461 - - $5,418
69,461
kWh
-
-
MMBtu
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$416
Cost:
$100
$416 11,723 - - $416
11,723
kWh
-
-
MMBtu
08: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$743
Cost:
$880
- - $743 180 -
-
kWh
$743
180
MMBtu
09: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$644
Cost:
-
- - $644 156 -
-
kWh
$644
156
MMBtu
10: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$10,811
Cost:
-
$10,811 - - - $10,811
-
kWh
-
-
MMBtu
11: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$16,570
Cost:
-
$16,570 - - - $16,570
-
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$40,602
Cost:
$16,218
$39,082 159,437 $1,520 368 $39,082
159,437
kWh
$1,520
368
MMBtu
TOTAL IMPLEMENTED Savings:
$12,672
Cost:
$15,666
$11,285 147,714 $1,387 336 $11,285
147,714
kWh
$1,387
336
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas