IAC logo
IAC Assessment: OK0449
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0449
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1994
Principal Product Frozen Pizza
NAICS n/a
SIC 2038 - Frozen Specialties, Nec
Sales $10,000,000-$50,000,000
# of Employees 260
Plant Area (Sq.Ft.) 60,000
Annual Production 2,800,000 Pieces
Production Hrs. Annual 3,744
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $333,572 6,019,930 kWh $0.06
Natural Gas $75,451 22,879 MMBtu $3.30
TOTAL ENERGY COSTS $409,023
RECOMMENDED SAVINGS* $46,220 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,180
Cost:
$7,639
$5,180 104,924 - - - - $5,180
104,924
kWh
-
-
MMBtu
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$7,356
Cost:
$9,402
$7,356 148,886 - - - - $7,356
148,886
kWh
-
-
MMBtu
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$326
Cost:
$212
- - $326 99 - - -
-
kWh
$326
99
MMBtu
-
-
$
04: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$7,041
Cost:
-
- - - - $7,041 - -
-
kWh
-
-
MMBtu
$7,041
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,794
Cost:
$6,053
$1,794 18,757 - - - - $1,794
18,757
kWh
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,424
Cost:
$4,064
$1,424 18,464 - - - - $1,424
18,464
kWh
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,208
Cost:
$1,495
$1,208 13,482 - - - - $1,208
13,482
kWh
-
-
MMBtu
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$858
Cost:
$70
$858 14,947 - - - - $858
14,947
kWh
-
-
MMBtu
-
-
$
09: 2.7134 USE PHOTOCELL CONTROLS Savings:
$382
Cost:
$25
$382 6,155 - - - - $382
6,155
kWh
-
-
MMBtu
-
-
$
10: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$20,651
Cost:
$51,659
- - $20,651 6,262 - - -
-
kWh
$20,651
6,262
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$46,220
Cost:
$80,619
$18,202 325,615 $20,977 6,361 $7,041 - $18,202
325,615
kWh
$20,977
6,361
MMBtu
$7,041
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes