IAC logo
IAC Assessment: OK0455
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0455
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1995
Principal Product Design and manufacturing of electronic equipment
NAICS n/a
SIC 3672 - Printed Circuit Boards
Sales $10,000,000-$50,000,000
# of Employees 213
Plant Area (Sq.Ft.) 108,000
Annual Production 10 Pieces
Production Hrs. Annual 2,600
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $66,441 1,873,681 kWh $0.04
Natural Gas $7,419 1,455 MMBtu $5.10
TOTAL ENERGY COSTS $73,860
RECOMMENDED SAVINGS* $14,127 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,351
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$7,900
Cost:
$25,000
$4,044 - $3,856 756 $4,044
-
kWh
$3,856
756
MMBtu
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,638
Cost:
-
$1,638 11,137 - - $1,638
11,137
kWh
-
-
MMBtu
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$913
Cost:
$128
$913 13,189 - - $913
13,189
kWh
-
-
MMBtu
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$903
Cost:
-
$903 - - - $903
-
kWh
-
-
MMBtu
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$837
Cost:
$540
$837 23,447 - - $837
23,447
kWh
-
-
MMBtu
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$749
Cost:
$112
$749 10,844 - - $749
10,844
kWh
-
-
MMBtu
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$467
Cost:
$1,100
$467 13,189 - - $467
13,189
kWh
-
-
MMBtu
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$387
Cost:
$684
$387 8,206 - - $387
8,206
kWh
-
-
MMBtu
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$333
Cost:
$1,186
$333 7,327 - - $333
7,327
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$14,127
Cost:
$28,750
$10,271 87,339 $3,856 756 $10,271
87,339
kWh
$3,856
756
MMBtu
TOTAL IMPLEMENTED Savings:
$3,351
Cost:
$2,414
$3,351 44,842 - - $3,351
44,842
kWh
-
-
MMBtu