IAC Assessment: OK0496
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0496
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1996
Principal Product Livestock and poultry feeds
NAICS n/a
SIC 2048 - Prepared Feeds, Nec
Sales $5,000,000-$10,000,000
# of Employees 25
Plant Area (Sq.Ft.) 40,000
Annual Production 42,000 Tons
Production Hrs. Annual 5,148
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $68,202 1,165,885 kWh $0.06
Electricity Fees $8,380 - $ -
Natural Gas $28,529 8,533 MMBtu $3.34
TOTAL ENERGY COSTS $127,495
RECOMMENDED SAVINGS* $43,095 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $40,663
#|Description Savings
Cost
Status Electricity Usage Solid Waste (non-haz) Electricity Usage Solid Waste (non-haz)
$ kWh $ lb
01: 3.8314 PURCHASE HIGH MATERIALS IN RETURNABLE BULK CONTAINERS Savings:
$32,272
Cost:
$140,000
- - $32,272 28,800 -
-
kWh
$32,272
28,800
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,549
Cost:
$3,017
$5,549 83,236 - - $5,549
83,236
kWh
-
-
lb
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,697
Cost:
$8,963
$2,697 40,152 - - $2,697
40,152
kWh
-
-
lb
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,930
Cost:
$300
$1,930 28,722 - - $1,930
28,722
kWh
-
-
lb
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$502
Cost:
$1,190
$502 7,620 - - $502
7,620
kWh
-
-
lb
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$145
Cost:
-
$145 2,052 - - $145
2,052
kWh
-
-
lb
TOTAL RECOMMENDED Savings:
$43,095
Cost:
$153,470
$10,823 161,782 $32,272 28,800 $10,823
161,782
kWh
$32,272
28,800
lb
TOTAL IMPLEMENTED Savings:
$40,663
Cost:
$151,980
$8,391 125,440 $32,272 28,800 $8,391
125,440
kWh
$32,272
28,800
lb
Savings
Cost
$ kWh $ lb
Electricity Usage Solid Waste (non-haz) Electricity Usage Solid Waste (non-haz)