IAC logo
IAC Assessment: OK0502
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0502
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1996
Principal Product 35mm/110mm film & "Color Key" Film
NAICS n/a
SIC 3081 - Unsupported Plastics Film & Sheet
Sales $100,000,000-$500,000,000
# of Employees 600
Plant Area (Sq.Ft.) 900,000
Annual Production 120,000,000 Thousand Feet
Production Hrs. Annual 8,760
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $738,606 20,307,445 kWh $0.04
Natural Gas $249,416 127,049 MMBtu $1.96
TOTAL ENERGY COSTS $1,003,466
RECOMMENDED SAVINGS* $37,965 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,672
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Electricity Usage Natural Gas Water Disposal
$ kWh $ MMBtu $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$874
Cost:
$2,754
$874 19,930 - - - - $874
19,930
kWh
-
-
MMBtu
-
-
Tgal
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,052
Cost:
$1,843
$1,052 24,033 - - - - $1,052
24,033
kWh
-
-
MMBtu
-
-
Tgal
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,241
Cost:
$10,815
$4,241 143,611 - - - - $4,241
143,611
kWh
-
-
MMBtu
-
-
Tgal
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$10,133
Cost:
-
- - $10,133 5,170 - - -
-
kWh
$10,133
5,170
MMBtu
-
-
Tgal
05: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE Savings:
$3,651
Cost:
-
- - $3,651 1,867 - - -
-
kWh
$3,651
1,867
MMBtu
-
-
Tgal
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$7,290
Cost:
$2,800
$7,290 247,069 - - - - $7,290
247,069
kWh
-
-
MMBtu
-
-
Tgal
07: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$10,724
Cost:
$3,400
- - - - $10,724 7,800,000 -
-
kWh
-
-
MMBtu
$10,724
7,800,000
Tgal
TOTAL RECOMMENDED Savings:
$37,965
Cost:
$21,612
$13,457 434,643 $13,784 7,037 $10,724 7,800,000 $13,457
434,643
kWh
$13,784
7,037
MMBtu
$10,724
7,800,000
Tgal
TOTAL IMPLEMENTED Savings:
$32,672
Cost:
$8,954
$8,164 266,999 $13,784 7,037 $10,724 7,800,000 $8,164
266,999
kWh
$13,784
7,037
MMBtu
$10,724
7,800,000
Tgal
Savings
Cost
$ kWh $ MMBtu $ Tgal
Electricity Usage Natural Gas Water Disposal Electricity Usage Natural Gas Water Disposal