IAC logo
IAC Assessment: OK0511
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0511
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1996
Principal Product Weld fittings
NAICS n/a
SIC 3449 - Miscellaneous Metal Work
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 74,000
Annual Production 6,000 Tons
Production Hrs. Annual 6,240
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $61,333 2,093,201 kWh $0.03
Electricity Demand $43,928 5,393 kW-months/year $8.15
Electricity Fees $4,062 - $ -
Natural Gas $185,244 78,552 MMBtu $2.36
TOTAL ENERGY COSTS $313,895
RECOMMENDED SAVINGS* $28,357 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,853
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$3,504
Cost:
$18,090
- - - - $3,504 1,522 - - -
-
kWh
-
-
kW-months/year
$3,504
1,522
MMBtu
-
-
Tgal
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$113
Cost:
$124
- - - - $113 49 - - -
-
kWh
-
-
kW-months/year
$113
49
MMBtu
-
-
Tgal
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,844
Cost:
$260
$2,844 97,011 - - - - - - $2,844
97,011
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,173
Cost:
$797
$716 24,326 $457 47 - - - - $716
24,326
kWh
$457
47
kW-months/year
-
-
MMBtu
-
-
Tgal
05: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$20,723
Cost:
$15,008
- - - - - - $20,723 6,046,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$20,723
6,046,000
Tgal
TOTAL RECOMMENDED Savings:
$28,357
Cost:
$34,279
$3,560 121,337 $457 47 $3,617 1,571 $20,723 6,046,000 $3,560
121,337
kWh
$457
47
kW-months/year
$3,617
1,571
MMBtu
$20,723
6,046,000
Tgal
TOTAL IMPLEMENTED Savings:
$24,853
Cost:
$16,189
$3,560 121,337 $457 47 $113 49 $20,723 6,046,000 $3,560
121,337
kWh
$457
47
kW-months/year
$113
49
MMBtu
$20,723
6,046,000
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal