Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 1997 |
Principal Product | Ceramic Fiber Blanket |
NAICS | n/a |
SIC | 3299 - Nonmetallic Mineral Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 71 |
Plant Area (Sq.Ft.) | 60,000 |
Annual Production | 5,000 Thousand Feet |
Production Hrs. Annual | 8,760 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $187,629 | 12,349,942 | kWh | $0.02 |
Electricity Demand | $184,460 | 19,203 | kW-months/year | $9.61 |
Natural Gas | $44,927 | 14,237 | MMBtu | $3.16 |
TOTAL ENERGY COSTS | $447,359 | |||
RECOMMENDED SAVINGS* | $45,580 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $38,755 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $2,700 Cost: $150 |
- | - | - | - | - | - | - | - | $2,700 | 103,500 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$2,700 103,500 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $924 Cost: - |
$496 | 32,825 | $428 | 45 | - | - | - | - | - | - | - | - |
$496 32,825 kWh |
$428 45 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.3133 USE OTHER WASTE CONCENTRATION METHODS |
Savings: $1,080 Cost: $1,530 |
- | - | - | - | - | - | $1,080 | 792 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$1,080 792 gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,757 Cost: $10,246 |
$1,487 | 97,890 | $1,270 | 133 | - | - | - | - | - | - | - | - |
$1,487 97,890 kWh |
$1,270 133 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.432 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME |
Savings: $26,000 Cost: - |
- | - | - | - | - | - | - | - | - | - | $26,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
$26,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT |
Savings: $5,294 Cost: $12,700 |
- | - | - | - | $5,294 | 1,796 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$5,294 1,796 MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.621 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES |
Savings: $6,825 Cost: $50 |
- | - | - | - | - | - | - | - | - | - | $6,825 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
$6,825 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $45,580 Cost: $24,676 |
$1,983 | 130,715 | $1,698 | 178 | $5,294 | 1,796 | $1,080 | 792 | $2,700 | 103,500 | $32,825 | - | $1,983 130,715 kWh |
$1,698 178 kW-months/year |
$5,294 1,796 MMBtu |
$1,080 792 gal |
$2,700 103,500 lb |
$32,825 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $38,755 Cost: $24,626 |
$1,983 | 130,715 | $1,698 | 178 | $5,294 | 1,796 | $1,080 | 792 | $2,700 | 103,500 | $26,000 | - | $1,983 130,715 kWh |
$1,698 178 kW-months/year |
$5,294 1,796 MMBtu |
$1,080 792 gal |
$2,700 103,500 lb |
$26,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes |