IAC logo
IAC Assessment: OK0515
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0515
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1997
Principal Product Ceramic Fiber Blanket
NAICS n/a
SIC 3299 - Nonmetallic Mineral Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 71
Plant Area (Sq.Ft.) 60,000
Annual Production 5,000 Thousand Feet
Production Hrs. Annual 8,760
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $187,629 12,349,942 kWh $0.02
Electricity Demand $184,460 19,203 kW-months/year $9.61
Natural Gas $44,927 14,237 MMBtu $3.16
TOTAL ENERGY COSTS $447,359
RECOMMENDED SAVINGS* $45,580 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $38,755
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $
01: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$2,700
Cost:
$150
- - - - - - - - $2,700 103,500 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$2,700
103,500
lb
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$924
Cost:
-
$496 32,825 $428 45 - - - - - - - - $496
32,825
kWh
$428
45
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
03: 3.3133 USE OTHER WASTE CONCENTRATION METHODS Savings:
$1,080
Cost:
$1,530
- - - - - - $1,080 792 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,080
792
gal
-
-
lb
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,757
Cost:
$10,246
$1,487 97,890 $1,270 133 - - - - - - - - $1,487
97,890
kWh
$1,270
133
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
05: 4.432 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME Savings:
$26,000
Cost:
-
- - - - - - - - - - $26,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$26,000
-
$
06: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$5,294
Cost:
$12,700
- - - - $5,294 1,796 - - - - - - -
-
kWh
-
-
kW-months/year
$5,294
1,796
MMBtu
-
-
gal
-
-
lb
-
-
$
07: 4.621 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES Savings:
$6,825
Cost:
$50
- - - - - - - - - - $6,825 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$6,825
-
$
TOTAL RECOMMENDED Savings:
$45,580
Cost:
$24,676
$1,983 130,715 $1,698 178 $5,294 1,796 $1,080 792 $2,700 103,500 $32,825 - $1,983
130,715
kWh
$1,698
178
kW-months/year
$5,294
1,796
MMBtu
$1,080
792
gal
$2,700
103,500
lb
$32,825
-
$
TOTAL IMPLEMENTED Savings:
$38,755
Cost:
$24,626
$1,983 130,715 $1,698 178 $5,294 1,796 $1,080 792 $2,700 103,500 $26,000 - $1,983
130,715
kWh
$1,698
178
kW-months/year
$5,294
1,796
MMBtu
$1,080
792
gal
$2,700
103,500
lb
$26,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes