Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1997
Principal Product Custom made pressure vessels
NAICS n/a
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $5,000,000-$10,000,000
# of Employees 37
Plant Area (Sq.Ft.) 90,000
Annual Production 60 Pieces
Production Hrs. Annual 2,080
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $26,937 976,553 kWh $0.03
Electricity Demand $35,801 378 kW-months/year $94.71
Electricity Fees $1,824 - $ -
Natural Gas $22,031 4,376 MMBtu $5.03
TOTAL ENERGY COSTS $56,021
RECOMMENDED SAVINGS* $39,585 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,370
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Solid Waste (haz) Electricity Usage Electricity Demand Solid Waste (non-haz) Solid Waste (haz)
$ kWh $ kW-months/year $ lb $ lb
01: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$15,799
Cost:
-
- - $15,799 167 - - - - -
-
kWh
$15,799
167
kW-months/year
-
-
lb
-
-
lb
02: 2.3312 INSTALL EFFICIENT RECTIFIERS Savings:
$1,114
Cost:
$2,963
$408 15,533 $706 7 - - - - $408
15,533
kWh
$706
7
kW-months/year
-
-
lb
-
-
lb
03: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS Savings:
$4,256
Cost:
$6,500
- - - - - - $4,256 5,005 -
-
kWh
-
-
kW-months/year
-
-
lb
$4,256
5,005
lb
04: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$1,050
Cost:
-
- - - - $1,050 - - - -
-
kWh
-
-
kW-months/year
$1,050
-
lb
-
-
lb
05: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$17,171
Cost:
$3,995
- - - - $17,171 30,530 - - -
-
kWh
-
-
kW-months/year
$17,171
30,530
lb
-
-
lb
06: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$195
Cost:
-
- - - - - - $195 - -
-
kWh
-
-
kW-months/year
-
-
lb
$195
-
lb
TOTAL RECOMMENDED Savings:
$39,585
Cost:
$13,458
$408 15,533 $16,505 174 $18,221 30,530 $4,451 5,005 $408
15,533
kWh
$16,505
174
kW-months/year
$18,221
30,530
lb
$4,451
5,005
lb
TOTAL IMPLEMENTED Savings:
$5,370
Cost:
$9,463
$408 15,533 $706 7 - - $4,256 5,005 $408
15,533
kWh
$706
7
kW-months/year
-
-
lb
$4,256
5,005
lb
Savings
Cost
$ kWh $ kW-months/year $ lb $ lb
Electricity Usage Electricity Demand Solid Waste (non-haz) Solid Waste (haz) Electricity Usage Electricity Demand Solid Waste (non-haz) Solid Waste (haz)