IAC logo
IAC Assessment: OK0538
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0538
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1998
Principal Product Biscotti-cookies
NAICS n/a
SIC 2052 - Cookies And Crackers
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 56,000
Annual Production 4,500,000 Pounds
Production Hrs. Annual 7,488
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $57,304 1,059,496 kWh $0.05
Electricity Fees $1,191 - $ -
Natural Gas $24,810 4,405 MMBtu $5.63
TOTAL ENERGY COSTS $93,865
RECOMMENDED SAVINGS* $171,441 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,881
#|Description Savings
Cost
Status Electricity Usage Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ lb $ $ $ $
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$4,000
Cost:
$1,600
$4,000 43,669 - - - - - - $4,000
43,669
kWh
-
-
lb
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$760
Cost:
$1,000
$599 8,206 - - $161 - - - $599
8,206
kWh
-
-
lb
$161
-
$
-
-
$
03: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$651
Cost:
-
- - - - - - $651 - -
-
kWh
-
-
lb
-
-
$
$651
-
$
04: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$87,640
Cost:
$100,000
- - $540 46,800 $87,100 - - - -
-
kWh
$540
46,800
lb
$87,100
-
$
-
-
$
05: 4.4520 ELIMINATE SHIFT Savings:
$49,920
Cost:
-
- - - - $49,920 - - - -
-
kWh
-
-
lb
$49,920
-
$
-
-
$
06: 3.5317 SELL / OFFER BY-PRODUCT AS ANIMAL FEED Savings:
$28,470
Cost:
-
- - $28,470 780,000 - - - - -
-
kWh
$28,470
780,000
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$171,441
Cost:
$102,600
$4,599 51,875 $29,010 826,800 $137,181 - $651 - $4,599
51,875
kWh
$29,010
826,800
lb
$137,181
-
$
$651
-
$
TOTAL IMPLEMENTED Savings:
$33,881
Cost:
$2,600
$4,599 51,875 $28,470 780,000 $161 - $651 - $4,599
51,875
kWh
$28,470
780,000
lb
$161
-
$
$651
-
$
Savings
Cost
$ kWh $ lb $ $ $ $
Electricity Usage Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Solid Waste (non-haz) Personnel Changes Administrative Changes