IAC logo
IAC Assessment: OK0543
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0543
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1998
Principal Product Frozen dough and apple pies
NAICS n/a
SIC 2045 - Prepared Flour Mixes And Doughs
Sales $100,000,000-$500,000,000
# of Employees 160
Plant Area (Sq.Ft.) 83,554
Annual Production 411,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $296,009 12,531,360 kWh $0.02
Electricity Demand $191,129 25,903 kW-months/year $7.38
Electricity Fees $3,205 - $ -
Natural Gas $13,195 3,003 MMBtu $4.39
TOTAL ENERGY COSTS $547,893
RECOMMENDED SAVINGS* $611,384 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $587,623
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ Tgal $ lb $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,341
Cost:
$3,402
$(-457) (-15,533) $(-214) (-30) - - - - $13,100 - $(-88) - $(-457)
(-15,533)
kWh
$(-214)
(-30)
kW-months/year
-
-
Tgal
-
-
lb
$13,100
-
$
$(-88)
-
$
02: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$3,965
Cost:
$200
$3,170 107,562 $795 1,104 - - - - - - - - $3,170
107,562
kWh
$795
1,104
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,150
Cost:
$1,450
$289 9,672 $97 13 - - - - - - $764 - $289
9,672
kWh
$97
13
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
$764
-
$
04: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$726
Cost:
$440
- - $726 101 - - - - - - - - -
-
kWh
$726
101
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$401
Cost:
$1,840
$288 9,672 $150 21 - - - - - - $(-37) - $288
9,672
kWh
$150
21
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
$(-37)
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$155
Cost:
$396
$155 5,275 - - - - - - - - - - $155
5,275
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
-
-
$
07: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$574,000
Cost:
$2,300,000
- - - - - - - - $574,000 - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
$574,000
-
$
-
-
$
08: 3.3122 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS Savings:
$18,646
Cost:
$50,200
- - - - $(-54) - $24,000 60,000 $(-5,300) - - - -
-
kWh
-
-
kW-months/year
$(-54)
-
Tgal
$24,000
60,000
lb
$(-5,300)
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$611,384
Cost:
$2,357,928
$3,445 116,648 $1,554 1,209 $(-54) - $24,000 60,000 $581,800 - $639 - $3,445
116,648
kWh
$1,554
1,209
kW-months/year
$(-54)
-
Tgal
$24,000
60,000
lb
$581,800
-
$
$639
-
$
TOTAL IMPLEMENTED Savings:
$587,623
Cost:
$2,306,078
$(-14) (-586) $662 92 - - - - $587,100 - $(-125) - $(-14)
(-586)
kWh
$662
92
kW-months/year
-
-
Tgal
-
-
lb
$587,100
-
$
$(-125)
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ lb $ $ $ $
Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost