Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 1998 |
Principal Product | Trailers |
NAICS | n/a |
SIC | 3715 - Truck Trailers |
Sales | $5,000,000-$10,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 3,200 Pieces |
Production Hrs. Annual | 2,080 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $29,361 | 613,130 | kWh | $0.05 |
Electricity Demand | $12,597 | - | kW-months/year | - |
Natural Gas | $9,840 | 2,946 | MMBtu | $3.34 |
TOTAL ENERGY COSTS | $39,718 | |||
RECOMMENDED SAVINGS* | $80,529 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $38,929 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Ancillary Material Cost | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT |
Savings: $956 Cost: $2,140 |
$956 | 35,170 | - | - | - | - | - | - |
$956 35,170 kWh |
- - kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3137 USE POWER DURING OFF-PEAK PERIODS |
Savings: $15,633 Cost: - |
$8,110 | 169,402 | $7,523 | - | - | - | - | - |
$8,110 169,402 kWh |
$7,523 - kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $715 Cost: $250 |
$715 | 26,377 | - | - | - | - | - | - |
$715 26,377 kWh |
- - kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.8123 PAY UTILITY BILLS ON TIME |
Savings: $656 Cost: - |
$656 | 13,775 | - | - | - | - | - | - |
$656 13,775 kWh |
- - kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $20,969 Cost: $50,000 |
- | - | - | - | $20,969 | - | - | - |
- - kWh |
- - kW-months/year |
$20,969 - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS |
Savings: $41,600 Cost: $260,000 |
- | - | - | - | - | - | $41,600 | - |
- - kWh |
- - kW-months/year |
- - lb |
$41,600 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $80,529 Cost: $312,390 |
$10,437 | 244,724 | $7,523 | - | $20,969 | - | $41,600 | - | $10,437 244,724 kWh |
$7,523 - kW-months/year |
$20,969 - lb |
$41,600 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $38,929 Cost: $52,390 |
$10,437 | 244,724 | $7,523 | - | $20,969 | - | - | - | $10,437 244,724 kWh |
$7,523 - kW-months/year |
$20,969 - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Ancillary Material Cost | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Ancillary Material Cost |