IAC logo
IAC Assessment: OK0560
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0560
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1998
Principal Product Wellhead equipment, gate valves
NAICS n/a
SIC 3533 - Oil And Gas Field Machinery
Sales $50,000,000-$100,000,000
# of Employees 144
Plant Area (Sq.Ft.) 125,000
Annual Production 0 Units
Production Hrs. Annual 4,680
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $106,839 3,741,208 kWh $0.03
Electricity Demand $78,787 8,570 kW-months/year $9.19
Electricity Fees $6,300 - $ -
Natural Gas $46,450 11,062 MMBtu $4.20
TOTAL ENERGY COSTS $270,409
RECOMMENDED SAVINGS* $133,884 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $93,103
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ lb $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$329
Cost:
$1,158
$228 7,913 $101 11 - - - - - - $228
7,913
kWh
$101
11
kW-months/year
-
-
lb
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,641
Cost:
$12,354
$1,446 50,410 $1,195 130 - - - - - - $1,446
50,410
kWh
$1,195
130
kW-months/year
-
-
lb
-
-
$
-
-
$
03: 4.4240 IMPROVE SPACE COMFORT CONDITIONING Savings:
$84,000
Cost:
$330,000
- - - - - - $84,000 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$84,000
-
$
-
-
$
04: 2.1332 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS Savings:
$6,750
Cost:
$59,000
- - - - - - - - $6,750 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$6,750
-
$
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$23,508
Cost:
$27,000
- - $23,508 3,000 - - - - - - -
-
kWh
$23,508
3,000
kW-months/year
-
-
lb
-
-
$
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,039
Cost:
$7,452
$2,039 112,837 - - - - - - - - $2,039
112,837
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$7,882
Cost:
-
- - - - $7,882 - - - - - -
-
kWh
-
-
kW-months/year
$7,882
-
lb
-
-
$
-
-
$
08: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$6,735
Cost:
-
- - - - $6,735 - - - - - -
-
kWh
-
-
kW-months/year
$6,735
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$133,884
Cost:
$436,964
$3,713 171,160 $24,804 3,141 $14,617 - $84,000 - $6,750 - $3,713
171,160
kWh
$24,804
3,141
kW-months/year
$14,617
-
lb
$84,000
-
$
$6,750
-
$
TOTAL IMPLEMENTED Savings:
$93,103
Cost:
$338,610
$2,267 120,750 $101 11 $6,735 - $84,000 - - - $2,267
120,750
kWh
$101
11
kW-months/year
$6,735
-
lb
$84,000
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost