IAC logo
IAC Assessment: OK0569
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0569
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1999
Principal Product Oil Field Chemicals
NAICS n/a
SIC 2819 - Industrial Inorganic Chemicals, Nec
Sales $50,000,000-$100,000,000
# of Employees 110
Plant Area (Sq.Ft.) 1,554,000
Annual Production 37,800 Thousand Feet
Production Hrs. Annual 8,760
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $152,626 10,494,432 kWh $0.01
Electricity Demand $67,173 - kW-months/year -
Electricity Fees $3,150 - $ -
Natural Gas $334,402 118,787 MMBtu $2.82
TOTAL ENERGY COSTS $1,137,824
RECOMMENDED SAVINGS* $276,140 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $136,289
#|Description Savings
Cost
Status Electricity Usage Other Liquid (non-haz) Other Liquid (haz) Administrative Changes Electricity Usage Other Liquid (non-haz) Other Liquid (haz) Administrative Changes
$ kWh $ gal $ gal $ $
01: 3.4151 MINIMIZE WATER USAGE Savings:
$127,756
Cost:
$296,160
- - - - $127,756 46,435 - - -
-
kWh
-
-
gal
$127,756
46,435
gal
-
-
$
02: 3.3125 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS Savings:
$74,871
Cost:
$125,000
- - $74,871 17,713 - - - - -
-
kWh
$74,871
17,713
gal
-
-
gal
-
-
$
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$32,085
Cost:
$3,300
$32,085 3,121,043 - - - - - - $32,085
3,121,043
kWh
-
-
gal
-
-
gal
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$19,442
Cost:
$26,944
$19,442 598,183 - - - - - - $19,442
598,183
kWh
-
-
gal
-
-
gal
-
-
$
05: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$9,062
Cost:
-
- - - - - - $9,062 - -
-
kWh
-
-
gal
-
-
gal
$9,062
-
$
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$5,140
Cost:
$13,288
$5,140 535,170 - - - - - - $5,140
535,170
kWh
-
-
gal
-
-
gal
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,918
Cost:
$6,195
$2,918 36,928 - - - - - - $2,918
36,928
kWh
-
-
gal
-
-
gal
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,833
Cost:
$3,098
$1,833 57,151 - - - - - - $1,833
57,151
kWh
-
-
gal
-
-
gal
-
-
$
09: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,193
Cost:
$683
$1,193 61,254 - - - - - - $1,193
61,254
kWh
-
-
gal
-
-
gal
-
-
$
10: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$945
Cost:
$656
$945 23,447 - - - - - - $945
23,447
kWh
-
-
gal
-
-
gal
-
-
$
11: 2.6232 INSTALL SET-BACK TIMERS Savings:
$895
Cost:
$420
$895 93,200 - - - - - - $895
93,200
kWh
-
-
gal
-
-
gal
-
-
$
TOTAL RECOMMENDED Savings:
$276,140
Cost:
$475,744
$64,451 4,526,376 $74,871 17,713 $127,756 46,435 $9,062 - $64,451
4,526,376
kWh
$74,871
17,713
gal
$127,756
46,435
gal
$9,062
-
$
TOTAL IMPLEMENTED Savings:
$136,289
Cost:
$177,825
$61,418 4,348,475 $74,871 17,713 - - - - $61,418
4,348,475
kWh
$74,871
17,713
gal
-
-
gal
-
-
$
Savings
Cost
$ kWh $ gal $ gal $ $
Electricity Usage Other Liquid (non-haz) Other Liquid (haz) Administrative Changes Electricity Usage Other Liquid (non-haz) Other Liquid (haz) Administrative Changes