IAC logo
IAC Assessment: OK0575
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0575
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1999
Principal Product Coffee
NAICS n/a
SIC 2095 - Roasted Coffee
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 100,000
Annual Production 1,500,000 Pounds
Production Hrs. Annual 6,240
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $36,859 492,380 kWh $0.07
Natural Gas $16,530 3,300 MMBtu $5.01
TOTAL ENERGY COSTS $58,404
RECOMMENDED SAVINGS* $42,523 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,177
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$306
Cost:
-
- - $306 - -
-
kWh
$306
-
$
02: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$2,531
Cost:
$1,764
$2,531 33,705 - - $2,531
33,705
kWh
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$616
Cost:
$400
$616 8,206 - - $616
8,206
kWh
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$243
Cost:
$417
$243 2,345 - - $243
2,345
kWh
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$307
Cost:
$210
$307 4,103 - - $307
4,103
kWh
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$495
Cost:
$273
$495 6,741 - - $495
6,741
kWh
-
-
$
07: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$15,210
Cost:
$22,500
- - $15,210 - -
-
kWh
$15,210
-
$
08: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$22,815
Cost:
$35,000
- - $22,815 - -
-
kWh
$22,815
-
$
TOTAL RECOMMENDED Savings:
$42,523
Cost:
$60,564
$4,192 55,100 $38,331 - $4,192
55,100
kWh
$38,331
-
$
TOTAL IMPLEMENTED Savings:
$17,177
Cost:
$23,800
$1,661 21,395 $15,516 - $1,661
21,395
kWh
$15,516
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes