IAC logo
IAC Assessment: OK0584
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0584
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1999
Principal Product Transformers
NAICS n/a
SIC 3612 - Transformers, Except Electronic
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 24,000
Annual Production 1,000 Pieces
Production Hrs. Annual 4,080
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $35,314 635,111 kWh $0.06
Electricity Demand $17,196 2,024 kW-months/year $8.50
Natural Gas $11,539 4,709 MMBtu $2.45
TOTAL ENERGY COSTS $102,653
RECOMMENDED SAVINGS* $43,463 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,001
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ $ $ lb $ $
01: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$662
Cost:
$1,778
$662 21,981 - - - - - - - - $662
21,981
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,195
Cost:
$331
$2,195 39,859 - - - - - - - - $2,195
39,859
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
03: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$1,000
Cost:
-
- - - - - - $1,000 40,000 - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,000
40,000
lb
-
-
$
04: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$163
Cost:
$248
$163 5,569 - - - - - - - - $163
5,569
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
05: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$6,842
Cost:
-
- - - - $6,842 - - - - - -
-
kWh
-
-
kW-months/year
$6,842
-
$
-
-
lb
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,001
Cost:
$300
$907 31,360 $1,094 124 - - - - - - $907
31,360
kWh
$1,094
124
kW-months/year
-
-
$
-
-
lb
-
-
$
07: 4.4250 ELIMINATE/REDUCE REDUNDANT INSPECTIONS Savings:
$30,600
Cost:
$15,000
- - - - - - - - $30,600 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
$30,600
-
$
TOTAL RECOMMENDED Savings:
$43,463
Cost:
$17,657
$3,927 98,769 $1,094 124 $6,842 - $1,000 40,000 $30,600 - $3,927
98,769
kWh
$1,094
124
kW-months/year
$6,842
-
$
$1,000
40,000
lb
$30,600
-
$
TOTAL IMPLEMENTED Savings:
$3,001
Cost:
$300
$907 31,360 $1,094 124 - - $1,000 40,000 - - $907
31,360
kWh
$1,094
124
kW-months/year
-
-
$
$1,000
40,000
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes