IAC logo
IAC Assessment: OK0588
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0588
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2000
Principal Product Electric Motors
NAICS n/a
SIC 3621 - Motors And Generators
Sales $100,000,000-$500,000,000
# of Employees 470
Plant Area (Sq.Ft.) 400,000
Annual Production 800,000 Units
Production Hrs. Annual 6,240
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $316,296 9,760,258 kWh $0.03
Electricity Demand $198,342 - kW-months/year -
Natural Gas $48,456 11,717 MMBtu $4.14
TOTAL ENERGY COSTS $546,948
RECOMMENDED SAVINGS* $107,523 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$12,131
Cost:
$24,500
$12,131 (-147,421) - - - - - - $12,131
(-147,421)
kWh
-
-
kW-months/year
-
-
lb
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$757
Cost:
$800
$535 16,120 $222 31 - - - - $535
16,120
kWh
$222
31
kW-months/year
-
-
lb
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$10,673
Cost:
$3,000
$7,546 228,605 $3,127 439 - - - - $7,546
228,605
kWh
$3,127
439
kW-months/year
-
-
lb
-
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$525
Cost:
$60
$154 11,137 $371 22 - - - - $154
11,137
kWh
$371
22
kW-months/year
-
-
lb
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,662
Cost:
$6,960
$1,367 99,941 $3,295 192 - - - - $1,367
99,941
kWh
$3,295
192
kW-months/year
-
-
lb
-
-
$
06: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$36,400
Cost:
$65,450
- - - - $36,400 - - - -
-
kWh
-
-
kW-months/year
$36,400
-
lb
-
-
$
07: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$18,000
Cost:
-
- - - - - - $18,000 - -
-
kWh
-
-
kW-months/year
-
-
lb
$18,000
-
$
08: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$24,375
Cost:
$65,000
- - - - - - $24,375 - -
-
kWh
-
-
kW-months/year
-
-
lb
$24,375
-
$
TOTAL RECOMMENDED Savings:
$107,523
Cost:
$165,770
$21,733 208,382 $7,015 684 $36,400 - $42,375 - $21,733
208,382
kWh
$7,015
684
kW-months/year
$36,400
-
lb
$42,375
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes