IAC logo
IAC Assessment: OK0603
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0603
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2000
Principal Product Ground Meat & Custom Steak Cutting
NAICS n/a
SIC 2011 - Meat Packing Plants
Sales $1,000,000-$5,000,000
# of Employees 15
Plant Area (Sq.Ft.) 24,000
Annual Production 480,000 Pounds
Production Hrs. Annual 2,920
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $31,436 1,154,161 kWh $0.03
Electricity Demand $31,784 5,330 kW-months/year $5.96
Electricity Fees $7,145 - $ -
Natural Gas $1,863 313 MMBtu $5.95
TOTAL ENERGY COSTS $72,828
RECOMMENDED SAVINGS* $10,564 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER Savings:
$1,186
Cost:
$13,982
- - - - $1,186 313 - - - - - - -
-
kWh
-
-
kW-months/year
$1,186
313
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$141
Cost:
$289
$97 3,584 $44 5 - - - - - - - - $97
3,584
kWh
$44
5
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$192
Cost:
$1,764
$81 4,021 $111 12 - - - - - - - - $81
4,021
kWh
$111
12
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$359
Cost:
$545
$152 7,474 $207 23 - - - - - - - - $152
7,474
kWh
$207
23
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 4.4450 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$1,586
Cost:
$1,783
- - - - - - - - $1,460 - $126 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$1,460
-
$
$126
-
$
06: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$7,100
Cost:
$10,000
- - - - - - $1,260 600 $5,840 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,260
600
lb
$5,840
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$10,564
Cost:
$28,363
$330 15,079 $362 40 $1,186 313 $1,260 600 $7,300 - $126 - $330
15,079
kWh
$362
40
kW-months/year
$1,186
313
MMBtu
$1,260
600
lb
$7,300
-
$
$126
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material