IAC Assessment: OK0662
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0662
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2003
Principal Product Piston Pins
NAICS 332722 - Bolt, Nut, Screw, Rivet, and Washer Manufacturing
SIC 3452 - Bolts, Nuts, Rivets, And Washers
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 103,000
Annual Production 6,000,000 Pieces
Production Hrs. Annual 8,760
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $209,283 7,501,200 kWh $0.03
Electricity Demand $162,351 31,200 kW-months/year $5.20
Electricity Fees $(-22,086) - $ -
Natural Gas $301,645 64,050 MMBtu $4.71
TOTAL ENERGY COSTS $621,025
RECOMMENDED SAVINGS* $20,476 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$832
Cost:
$3,222
- - $832 160 - - - - -
-
kWh
$832
160
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$181
Cost:
$300
$181 6,490 - - - - - - $181
6,490
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,135
Cost:
$3,289
$2,135 76,508 - - - - - - $2,135
76,508
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$406
Cost:
$221
- - - - $406 94 - - -
-
kWh
-
-
kW-months/year
$406
94
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$165
Cost:
$864
$192 6,864 - - - - $(-27) - $192
6,864
kWh
-
-
kW-months/year
-
-
MMBtu
$(-27)
-
$
06: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$6,326
Cost:
$23,100
$6,326 226,740 - - - - - - $6,326
226,740
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$1,701
Cost:
$1,011
- - - - $1,701 393 - - -
-
kWh
-
-
kW-months/year
$1,701
393
MMBtu
-
-
$
08: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$8,730
Cost:
$1,000
$4,079 146,216 $4,651 448 - - - - $4,079
146,216
kWh
$4,651
448
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$20,476
Cost:
$33,007
$12,913 462,818 $5,483 608 $2,107 487 $(-27) - $12,913
462,818
kWh
$5,483
608
kW-months/year
$2,107
487
MMBtu
$(-27)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost