IAC logo
IAC Assessment: OK0663
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0663
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2003
Principal Product Battered & Breaded Chicken, Charbroil Chicken and Beef
NAICS 311612 - Meat Processed from Carcasses
SIC 2013 - Sausages And Other Prepared Meats
Sales $100,000,000-$500,000,000
# of Employees 400
Plant Area (Sq.Ft.) 150,000
Annual Production 60,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $467,321 18,604,400 kWh $0.03
Electricity Demand $250,168 41,349 kW-months/year $6.05
Electricity Fees $66,933 - $ -
Natural Gas $536,554 119,680 MMBtu $4.48
TOTAL ENERGY COSTS $1,320,976
RECOMMENDED SAVINGS* $90,131 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,024
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,549
Cost:
$3,270
- - $3,549 580 - - - - -
-
kWh
$3,549
580
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$830
Cost:
$5,487
$301 11,997 $375 70 - - $154 - $301
11,997
kWh
$375
70
kW-months/year
-
-
MMBtu
$154
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$501
Cost:
$748
$501 19,945 - - - - - - $501
19,945
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$55,688
Cost:
$83,636
$55,688 2,218,640 - - - - - - $55,688
2,218,640
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,384
Cost:
$4,820
- - - - $2,384 532 - - -
-
kWh
-
-
kW-months/year
$2,384
532
MMBtu
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,144
Cost:
$568
$860 34,272 $284 71 - - - - $860
34,272
kWh
$284
71
kW-months/year
-
-
MMBtu
-
-
$
07: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$26,035
Cost:
$2,100
- - $26,035 3,730 - - - - -
-
kWh
$26,035
3,730
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$90,131
Cost:
$100,629
$57,350 2,284,854 $30,243 4,451 $2,384 532 $154 - $57,350
2,284,854
kWh
$30,243
4,451
kW-months/year
$2,384
532
MMBtu
$154
-
$
TOTAL IMPLEMENTED Savings:
$6,024
Cost:
$10,073
$1,662 66,214 $4,208 721 - - $154 - $1,662
66,214
kWh
$4,208
721
kW-months/year
-
-
MMBtu
$154
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost