Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 2003 |
Principal Product | Instrumentation & Control Equipment |
NAICS | 334513 - Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial |
SIC | 3823 - Process Control Instruments |
Sales | $50,000,000-$100,000,000 |
# of Employees | 300 |
Plant Area (Sq.Ft.) | 187,000 |
Annual Production | 1,500,000 Pieces |
Production Hrs. Annual | 5,148 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $175,399 | 3,642,320 | kWh | $0.05 |
Electricity Fees | $(-5,246) | - | $ | - |
Natural Gas | $26,305 | 4,300 | MMBtu | $6.12 |
TOTAL ENERGY COSTS | $196,756 | |||
RECOMMENDED SAVINGS* | $38,293 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $25,063 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $4,895 Cost: $664 |
- | - | $4,895 | 800 | - | - | - | - |
- - kWh |
$4,895 800 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,602 Cost: - |
$2,602 | 58,212 | - | - | - | - | - | - |
$2,602 58,212 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $2,094 Cost: $6,844 |
- | - | $2,094 | 300 | - | - | - | - |
- - kWh |
$2,094 300 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $2,748 Cost: $3,480 |
$2,748 | 61,488 | - | - | - | - | - | - |
$2,748 61,488 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE |
Savings: $10,600 Cost: - |
- | - | - | - | $10,600 | - | - | - |
- - kWh |
- - kW-months/year |
$10,600 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,398 Cost: $1,374 |
$1,398 | 31,278 | - | - | - | - | - | - |
$1,398 31,278 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $5,550 Cost: $13,880 |
$3,912 | 87,516 | $886 | 204 | - | - | $752 | - |
$3,912 87,516 kWh |
$886 204 kW-months/year |
- - $ |
$752 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,270 Cost: $1,048 |
$608 | 13,605 | $274 | 63 | - | - | $388 | - |
$608 13,605 kWh |
$274 63 kW-months/year |
- - $ |
$388 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD |
Savings: $7,136 Cost: $32,000 |
$7,136 | 159,650 | - | - | - | - | - | - |
$7,136 159,650 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $38,293 Cost: $59,290 |
$18,404 | 411,749 | $8,149 | 1,367 | $10,600 | - | $1,140 | - | $18,404 411,749 kWh |
$8,149 1,367 kW-months/year |
$10,600 - $ |
$1,140 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $25,063 Cost: $19,072 |
$7,268 | 162,609 | $6,055 | 1,067 | $10,600 | - | $1,140 | - | $7,268 162,609 kWh |
$6,055 1,067 kW-months/year |
$10,600 - $ |
$1,140 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost |