Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 2003 |
Principal Product | Fittings, Plastic, Metal for Gas Distribution |
NAICS | 332996 - Fabricated Pipe and Pipe Fitting Manufacturing |
SIC | 3498 - Fabricated Pipe And Fittings |
Sales | $10,000,000-$50,000,000 |
# of Employees | 120 |
Plant Area (Sq.Ft.) | 70,000 |
Annual Production | 2,400,000 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $86,229 | 3,250,800 | kWh | $0.03 |
Electricity Demand | $74,941 | 7,117 | kW-months/year | $10.53 |
Electricity Fees | $12,579 | - | $ | - |
Natural Gas | $80,199 | 13,454 | MMBtu | $5.96 |
TOTAL ENERGY COSTS | $277,686 | |||
RECOMMENDED SAVINGS* | $26,920 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $1,098 Cost: $4,390 |
- | - | - | - | - | - | $1,414 | 352 | $(-1,950) | - | $1,634 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$1,414 352 gal |
$(-1,950) - $ |
$1,634 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.5311 RECOVER AND REUSE WASTE MATERIAL |
Savings: $1,957 Cost: $564 |
- | - | - | - | - | - | $3,145 | 264 | $(-1,950) | - | $762 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$3,145 264 gal |
$(-1,950) - $ |
$762 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $670 Cost: $760 |
$670 | 24,722 | - | - | - | - | - | - | - | - | - | - |
$670 24,722 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $4,471 Cost: $1,855 |
- | - | - | - | $4,471 | 750 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,471 750 MMBtu |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $931 Cost: $185 |
$931 | 34,360 | - | - | - | - | - | - | - | - | - | - |
$931 34,360 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $604 Cost: $643 |
$133 | 4,906 | $55 | 7 | - | - | - | - | $260 | - | $156 | - |
$133 4,906 kWh |
$55 7 kW-months/year |
- - MMBtu |
- - gal |
$260 - $ |
$156 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $551 Cost: $2,519 |
$551 | 20,348 | - | - | - | - | - | - | - | - | - | - |
$551 20,348 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $7,918 Cost: $367 |
$8,110 | 299,275 | - | - | - | - | - | - | $(-192) | - | - | - |
$8,110 299,275 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$(-192) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $652 Cost: $5,401 |
$221 | 8,160 | $342 | 42 | - | - | - | - | - | - | $89 | - |
$221 8,160 kWh |
$342 42 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
$89 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN |
Savings: $2,803 Cost: $500 |
$1,774 | 65,462 | $1,029 | 126 | - | - | - | - | - | - | - | - |
$1,774 65,462 kWh |
$1,029 126 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $5,265 Cost: - |
- | - | $5,265 | 500 | - | - | - | - | - | - | - | - |
- - kWh |
$5,265 500 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $26,920 Cost: $17,184 |
$12,390 | 457,233 | $6,691 | 675 | $4,471 | 750 | $4,559 | 616 | $(-3,832) | - | $2,641 | - | $12,390 457,233 kWh |
$6,691 675 kW-months/year |
$4,471 750 MMBtu |
$4,559 616 gal |
$(-3,832) - $ |
$2,641 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Personnel Changes | Ancillary Material Cost |