Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 2003 |
Principal Product | Toner |
NAICS | 325992 - Photographic Film, Paper, Plate, and Chemical Manufacturing |
SIC | 3861 - Photographic Equipment And Supplies |
Sales | $50,000,000-$100,000,000 |
# of Employees | 180 |
Plant Area (Sq.Ft.) | 850,000 |
Annual Production | 15,000,000 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $2,120,162 | 89,640,000 | kWh | $0.02 |
Electricity Demand | $1,097,003 | 160,134 | kW-months/year | $6.85 |
Electricity Fees | $89,455 | - | $ | - |
Natural Gas | $884,739 | 188,529 | MMBtu | $4.69 |
TOTAL ENERGY COSTS | $4,457,399 | |||
RECOMMENDED SAVINGS* | $323,719 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $163,185 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $26,150 Cost: $61,955 |
$20,969 | 884,760 | $6,408 | 1,212 | - | - | - | - | $(-1,227) | - |
$20,969 884,760 kWh |
$6,408 1,212 kW-months/year |
- - MMBtu |
- - $ |
$(-1,227) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $25,013 Cost: $38,456 |
$7,235 | 305,269 | $2,220 | 420 | - | - | $15,558 | - | - | - |
$7,235 305,269 kWh |
$2,220 420 kW-months/year |
- - MMBtu |
$15,558 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $6,113 Cost: $1,885 |
$6,113 | 257,929 | - | - | - | - | - | - | - | - |
$6,113 257,929 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,597 Cost: - |
$3,370 | 142,200 | $1,027 | 194 | - | - | $(-800) | - | - | - |
$3,370 142,200 kWh |
$1,027 194 kW-months/year |
- - MMBtu |
$(-800) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $67,238 Cost: - |
- | - | $67,238 | 9,815 | - | - | - | - | - | - |
- - kWh |
$67,238 9,815 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $21,821 Cost: $1,125 |
$16,713 | 705,180 | $5,108 | 966 | - | - | - | - | - | - |
$16,713 705,180 kWh |
$5,108 966 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4234 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER |
Savings: $50,260 Cost: $51,780 |
$38,490 | 1,624,068 | $11,770 | 2,225 | - | - | - | - | - | - |
$38,490 1,624,068 kWh |
$11,770 2,225 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $31,772 Cost: $9,500 |
- | - | - | - | $31,772 | 6,770 | - | - | - | - |
- - kWh |
- - kW-months/year |
$31,772 6,770 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,369 Cost: $1,455 |
- | - | - | - | $1,369 | 149 | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,369 149 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,501 Cost: $6,296 |
$3,501 | 147,759 | - | - | - | - | - | - | - | - |
$3,501 147,759 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $32,447 Cost: $112,608 |
$32,447 | 1,369,074 | - | - | - | - | - | - | - | - |
$32,447 1,369,074 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $16,404 Cost: $34,425 |
$16,404 | 692,161 | - | - | - | - | - | - | - | - |
$16,404 692,161 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.7311 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE |
Savings: $38,034 Cost: $1,647 |
$29,131 | 1,229,153 | $8,903 | 1,684 | - | - | - | - | - | - |
$29,131 1,229,153 kWh |
$8,903 1,684 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $323,719 Cost: $321,132 |
$174,373 | 7,357,553 | $102,674 | 16,516 | $33,141 | 6,919 | $14,758 | - | $(-1,227) | - | $174,373 7,357,553 kWh |
$102,674 16,516 kW-months/year |
$33,141 6,919 MMBtu |
$14,758 - $ |
$(-1,227) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $163,185 Cost: $44,568 |
$62,562 | 2,639,731 | $84,496 | 13,079 | $1,369 | 149 | $14,758 | - | - | - | $62,562 2,639,731 kWh |
$84,496 13,079 kW-months/year |
$1,369 149 MMBtu |
$14,758 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||