Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2003
Principal Product Thrust Reversers, Nacelles
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $50,000,000-$100,000,000
# of Employees 300
Plant Area (Sq.Ft.) 375,000
Annual Production 216 Pieces
Production Hrs. Annual 4,160
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $299,579 12,065,200 kWh $0.02
Electricity Demand $169,901 39,975 kW-months/year $4.25
Electricity Fees $44,104 - $ -
Natural Gas $65,945 11,105 MMBtu $5.94
TOTAL ENERGY COSTS $579,529
RECOMMENDED SAVINGS* $65,272 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,851
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Water Disposal Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ Tgal $ $ $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$5,885
Cost:
$6,844
- - $5,885 960 - - - - - - -
-
kWh
$5,885
960
kW-months/year
-
-
Tgal
-
-
$
-
-
$
02: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$28,340
Cost:
-
- - $28,340 6,668 - - - - - - -
-
kWh
$28,340
6,668
kW-months/year
-
-
Tgal
-
-
$
-
-
$
03: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$12,626
Cost:
$2,000
- - - - - - $12,626 - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$12,626
-
$
-
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,333
Cost:
$145
$1,362 54,912 $971 158 - - - - - - $1,362
54,912
kWh
$971
158
kW-months/year
-
-
Tgal
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,041
Cost:
-
$1,041 41,933 - - - - - - - - $1,041
41,933
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,292
Cost:
$8,190
- - - - - - $1,292 - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$1,292
-
$
-
-
$
07: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$7,225
Cost:
$262
- - - - $7,225 2,500 - - - - -
-
kWh
-
-
kW-months/year
$7,225
2,500
Tgal
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,952
Cost:
$28,902
$3,719 149,760 $2,648 432 - - - - $(-415) - $3,719
149,760
kWh
$2,648
432
kW-months/year
-
-
Tgal
-
-
$
$(-415)
-
$
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$578
Cost:
$488
$578 23,296 - - - - - - - - $578
23,296
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$65,272
Cost:
$46,831
$6,700 269,901 $37,844 8,218 $7,225 2,500 $13,918 - $(-415) - $6,700
269,901
kWh
$37,844
8,218
kW-months/year
$7,225
2,500
Tgal
$13,918
-
$
$(-415)
-
$
TOTAL IMPLEMENTED Savings:
$19,851
Cost:
$2,262
- - - - $7,225 2,500 $12,626 - - - -
-
kWh
-
-
kW-months/year
$7,225
2,500
Tgal
$12,626
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $ $ $
Electricity Usage Electricity Demand Water Disposal Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Water Disposal Administrative Changes Ancillary Material Cost